Quality Control Manager - Data Center

New Florence, MO

Apply Apply with LinkedIn
Save

Type: Direct-Hire

Experience: 7

Category: Construction

Contractor Work Model: Onsite

Brand: System One

Compensation Range: 120000.00 - 150000.00

Job ID: 348292

Date Posted: 03/25/2026

Shortcut: http://jobs.systemone.com/1a63kQ


Job Title: Quality Control Manager - Data Center
Type: Direct Hire
Compensation: $120k-$150k + Traveler Bonus: 15% weekly bonus in addition to base salary
Monthly Living Stipend & Mobilization Support offered.
Contractor Work Model: Onsite


Responsibilities

  • Collaborate with project teams throughout the project lifecycle to ensure quality standards are met.
  • Develop and implement comprehensive quality control plans, inspection checklists, sampling procedures, and testing protocols.
  • Conduct regular on-site inspections of construction activities to identify potential quality issues and deviations from plans.
  • Maintain detailed documentation of inspections, including photographs, data sheets, and non-conformance reports.
  • Review contractor submittals such as shop drawings, material data sheets, and test reports for compliance.
  • Coordinate and oversee material testing and sampling to verify adherence to quality standards.
  • Identify and address quality issues promptly by initiating corrective action plans to ensure timely mitigation.
  • Monitor subcontractor quality practices to ensure project requirements are met.
  • Stay updated on relevant regulations and ensure project compliance with all applicable quality standards.

Requirements

  • Bachelor’s degree in engineering, architecture, construction management, engineering technology, building construction, building science, or related field.
  • 7-10 years of experience as a Superintendent, Quality Control Manager, Project Manager, Project Engineer, Construction Manager, or similar role.
  • Experience supporting greenfield data center construction, mission critical environments.
  • OSHA-30 certification.
  • Construction Quality Management for Contractors (CQM-C) Certification.
  • Familiarity with EM 385-1-1 requirements, hazard identification, safety compliance, and sustainability.
  • Proven experience leading and managing diverse teams and external agencies.
  • Strong communication, problem-solving, multi-tasking, and self-prioritization skills.
  • Motivated, proactive, and collaborative team player.

System One, and its subsidiaries including Joulé and Mountain Ltd., are leaders in delivering outsourced services and workforce solutions across North America. We help clients get work done more efficiently and economically, without compromising quality. System One not only serves as a valued partner for our clients, but we offer eligible employees health and welfare benefits coverage options including medical, dental, vision, spending accounts, life insurance, voluntary plans, as well as participation in a 401(k) plan.

System One is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy, childbirth, or related medical conditions), sexual orientation, gender identity, age, national origin, disability, family care or medical leave status, genetic information, veteran status, marital status, or any other characteristic protected by applicable federal, state, or local law.

#M-
#LI-

Ref: #223-Eng Orlando

  • Quality Control Manager

    Des Moines, Iowa

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • Quality Control Manager

    Omaha, Nebraska

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • Quality Control Manager

    Kansas City, MO

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • Quality Control Manager

    Council Bluffs, Iowa

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • Quality Control Manager

    Columbus, Ohio

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • Quality Control Manager

    Mount Pleasant, Wisconsin

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • Quality Control Manager

    Dekalb, Illinois

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • Quality Control Manager

    New Florence, MO

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • Quality Control Manager

    St. Louis, MO

    Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...

    Date Posted: 03/16/2026 Recommended

  • MEP Superintendent - Mission Critical

    Tulsa , Oklahoma

    POSITION SUMMARY Successful candidates must be able to provide proof of ability to work in the U.S. without sponsorship. The MEP Superintendent is responsible for managing mechanical, electrical, and plumbing (MEP) field operations to ensure projects a...

    Date Posted: 03/05/2026 Recommended

  • Site Construction Supervisor

    Denver, Colorado

    Job Title: Site Construction Supervisor Location: Denver, Colorado Type: 12 months Contract Compensation: $55.00 - $57.00 hourly Contractor Work Model: Onsite System One is currently seeking a Site Construction Supervisor on a 12 month contract positio...

    Date Posted: 02/11/2026 Recommended

  • Construction Manager

    Washington, District Of Columbia

    Construction Manager Location: Washington, DC Type: Contract Work Model: Onsite Overview System One is seeking a Construction Manager to support a long-term, confidential utility substation GIS project in Washington, DC. This role will provide on-site ...

    Date Posted: 03/12/2026 Recommended

  • Construction Manager-Saline

    Saline, Michigan

    The data center boom is real—and we’re building the future. Get in on the action and apply today! Job Title: Data Center Construction Manager Location: Saline, MI Type: Full-Time Project (12-24 months) About the Role We’re seeking a seasoned Data Cente...

    Date Posted: 02/20/2026 Recommended

  • Low Voltage Project Manager

    Tulsa, Oklahoma

    As a Low Voltage Project Manager, you will play a pivotal role in overseeing the successful completion of Low Voltage installation projects on time and within budget. You will be responsible for: Developing comprehensive project plans and schedules Dir...

    Date Posted: 03/17/2026 Recommended

  • Substation Quality Inspector

    Calera, Alabama

    Job Title: Substation Quality Inspector Location: Calera, Alabama Type: 3 year Contract Compensation: $50.00 Contractor Work Model: Onsite Hours: 40.0 Responsibilities Perform quality inspections on substations to ensure compliance with project specifi...

    Date Posted: 03/24/2026 Recommended

  • Field Project Engineer

    Sealy, Texas

    Job Title: Field Project Engineer Location: Sealy, Texas Type: Contract To Hire Compensation: $50-$70/hour Contractor Work Model: Onsite Field Project Engineer Responsibilities: Construction & Field Execution Lead daily on-site construction and install...

    Date Posted: 03/06/2026 Recommended

  • Construction Project Manager

    Catoosa, Oklahoma

    System One is working with a local client to find a Construction Project Manager in Tulsa Ok. Job Description Responsible for managing and coordinating assigned construction projects from initiation through execution to successful completion. This role...

    Date Posted: 03/26/2026 Recommended

  • Electrical Project Manager

    Austin, TX

    Job Title: Electrical Project Manager Location: Austin, Texas Type: Direct Hire System One is assisting a client in hiring a Electrical Project Manager to support a large-scale mission critical project in the Austin, Texas region. This role is on-site ...

    Date Posted: 01/02/2026 Recommended

  • Electrical Project Manager

    Lockhart, TX

    Job Title: Electrical Project Manager Location: Lockhart, Texas Type: Direct Hire System One is assisting a client in hiring an Electrical Project Manager to support a large-scale mission critical project in the Lockhart, Texas. This role is on-site an...

    Date Posted: 01/02/2026 Recommended

  • Blender/Chemical Plant Operator

    East Hanover, New Jersey

    Job Title: Blender/Chemical Plant Operator Location: East Hanover, New Jersey Type: Contract Compensation: $28.00 Contractor Work Model: Onsite Hours: M-F 6:00 a.m. - 2:30 p.m., occasional Saturdays Responsibilities Follow Standard Operation Procedures...

    Date Posted: 03/09/2026 Recommended

  • Construction Safety Manager

    St. Louis, MO

    Job Title: Safety Manager Location: Nationwide Travel Type: Direct Hire Base Salary: $120,000 – $150,000 + Traveler Bonus: 15% weekly bonus in addition to base salary Monthly Living Stipend & Mobilization Support offered. Position Overview System One i...

    Date Posted: 03/16/2026 Recommended

  • Operations Support Specialist 3

    Los Alamos, New Mexico

    Job Title: Operations Support Specialist 3 Location: Los Alamos, New Mexico Security Clearance: Active DOE Q Clearance Required Schedule: Full-time, 40 hours per week Contract Period: February 23, 2026 – February 23, 2028 Positions Available: 4 Positio...

    Date Posted: 02/13/2026 Recommended

  • Clinical Data Manager II

    South San Francisco, CA

    Job Title: Clinical Data Manager II Location: South San Francisco, CA Type: Contract Compensation: $80.00 Contractor Work Model: Hybrid Hours: 40.0 Security Clearance: Not specified in the description Overview Leave placeholder text here for recruiter ...

    Date Posted: 03/20/2026 Recommended

  • Senior Engineer

    Austin, Texas

    Position Description Play a key role in supporting Austin-based growth initiatives. You’ll work on a wide range of pipeline and infrastructure projects that bring natural gas utility service to new subdivisions and commercial developments. We’re lookin...

    Date Posted: 03/20/2026 Recommended

  • Staff Engineering Technician - Civil 3D Drafter

    Denver, Colorado

    Staff Engineering Technician Denver, CO 80237 System One is seeking a Staff Engineering Technician in Denver, CO to perform advanced functions requiring technical knowledge and use of electronic applications, standards, and document control processes/p...

    Date Posted: 01/29/2026 Recommended

  • Staff Engineering Technician - Civil 3D Drafter

    Jacksonville, Florida

    Staff Engineering Technician Jacksonville, FL 32258 System One is seeking a Staff Engineering Technician in Jacksonville, FL to perform advanced functions requiring technical knowledge and use of electronic applications, standards, and document control...

    Date Posted: 01/29/2026 Recommended

  • Staff Engineering Technician - Civil 3D Drafter

    Houston, Texas

    Staff Engineering Technician Houston, TX 77079 System One is seeking a Staff Engineering Technician in Houston, TX to perform advanced functions requiring technical knowledge and use of electronic applications, standards, and document control processes...

    Date Posted: 01/29/2026 Recommended

  • Staff Engineering Technician - Civil 3D Drafter

    Orlando, Florida

    Staff Engineering Technician Orlando, FL 32801 System One is seeking a Staff Engineering Technician in Orlando, FL to perform advanced functions requiring technical knowledge and use of electronic applications, standards, and document control processes...

    Date Posted: 01/29/2026 Recommended

  • Project Controls-Data Center

    Houston, Texas

    Job Title: Project Controls-Data Center Location: Houston, Texas Type: Contract To Hire Compensation: $63.71 - $117.07 hourly Contractor Work Model: Onsite Overview The Project Controls Manager leads all planning, cost control, risk management, and per...

    Date Posted: 03/02/2026 Recommended

  • Reactor Enclosure System (RES) Fabrication Manager

    Bellevue, WA

    Job Title: Reactor Enclosure System (RES) Fabrication Manager Location: Bellevue, WA Type: Contract Compensation: $56.00 - $95.00 Contractor Work Model: Remote Hours: 40.0 Overview System One is seeking to contract with a Reactor Enclosure System (RES)...

    Date Posted: 03/17/2026 Recommended