Quality Control Manager - Data Center
New Florence, MO
Experience: 7
Category: Construction
Contractor Work Model: Onsite
Brand: System One
Compensation Range: 120000.00 - 150000.00
Job ID: 348292
Date Posted: 03/25/2026
Shortcut: http://jobs.systemone.com/9RqbzM
Job Title: Quality Control Manager - Data Center
Type: Direct Hire
Compensation: $120k-$150k + Traveler Bonus: 15% weekly bonus in addition to base salary
Monthly Living Stipend & Mobilization Support offered.
Contractor Work Model: Onsite
Responsibilities
- Collaborate with project teams throughout the project lifecycle to ensure quality standards are met.
- Develop and implement comprehensive quality control plans, inspection checklists, sampling procedures, and testing protocols.
- Conduct regular on-site inspections of construction activities to identify potential quality issues and deviations from plans.
- Maintain detailed documentation of inspections, including photographs, data sheets, and non-conformance reports.
- Review contractor submittals such as shop drawings, material data sheets, and test reports for compliance.
- Coordinate and oversee material testing and sampling to verify adherence to quality standards.
- Identify and address quality issues promptly by initiating corrective action plans to ensure timely mitigation.
- Monitor subcontractor quality practices to ensure project requirements are met.
- Stay updated on relevant regulations and ensure project compliance with all applicable quality standards.
Requirements
- Bachelor’s degree in engineering, architecture, construction management, engineering technology, building construction, building science, or related field.
- 7-10 years of experience as a Superintendent, Quality Control Manager, Project Manager, Project Engineer, Construction Manager, or similar role.
- Experience supporting greenfield data center construction, mission critical environments.
- OSHA-30 certification.
- Construction Quality Management for Contractors (CQM-C) Certification.
- Familiarity with EM 385-1-1 requirements, hazard identification, safety compliance, and sustainability.
- Proven experience leading and managing diverse teams and external agencies.
- Strong communication, problem-solving, multi-tasking, and self-prioritization skills.
- Motivated, proactive, and collaborative team player.
System One, and its subsidiaries including Joulé and Mountain Ltd., are leaders in delivering outsourced services and workforce solutions across North America. We help clients get work done more efficiently and economically, without compromising quality. System One not only serves as a valued partner for our clients, but we offer eligible employees health and welfare benefits coverage options including medical, dental, vision, spending accounts, life insurance, voluntary plans, as well as participation in a 401(k) plan.
System One is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy, childbirth, or related medical conditions), sexual orientation, gender identity, age, national origin, disability, family care or medical leave status, genetic information, veteran status, marital status, or any other characteristic protected by applicable federal, state, or local law.
#M-
#LI-
Ref: #223-Eng Orlando
-
Quality Control Manager
New Florence, MO
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Quality Control Manager
Des Moines, Iowa
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Quality Control Manager
Omaha, Nebraska
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Quality Control Manager
Kansas City, MO
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Quality Control Manager
St. Louis, MO
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Quality Control Manager
Mount Pleasant, Wisconsin
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Quality Control Manager
Council Bluffs, Iowa
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Quality Control Manager
Columbus, Ohio
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Quality Control Manager
Dekalb, Illinois
Job Title: Quality Control Manager Location: Central Missouri Type: Direct Hire Compensation: $120,000.00 - $150,000.00 plus Monthly Living Stipend Contractor Work Model: Onsite Hours: 40.0 Responsibilities Collaborate with project teams throughout the...
Date Posted: 03/16/2026 Recommended
-
Electrical Project Manager
Lenexa, KS
Job Title: Electrical Project Manager Location: Lenexa, KS Type: Contract To Hire Compensation: $100,000 - $120,000 Contractor Work Model: Onsite – onsite Hours: 40.0 Security Clearance: Not specified Responsibilities Manage the full project life cycle...
Date Posted: 04/22/2026 Recommended
-
Assoc Engineering Technician (Water) - Civil 3D Designer Drafter
Orlando, Florida
Associate Engineering Technician – Civil (Water) Location: Orlando, Florida Work Schedule: Onsite – 5 days per week Employment Type: Contract-to-Hire Industry: Water & Infrastructure Position Overview Our client is seeking a Civil Associate Engineering...
Date Posted: 04/27/2026 Recommended
-
Precast Production Technician
Pottstown, Pennsylvania
Job Title: Precast Production Technician Location: Pottstown, Pennsylvania Type: Contract To Hire Schedule: M-F Day, must be flexible Overview Industrial Manufacturing Company is seeking a Technician to support in quality testing of raw materials, in-p...
Date Posted: 04/16/2026 Recommended
-
Sr Manager Standards & Systems
Plainsboro, NJ
Job Title: Sr Manager Standards & Systems Location: REMOTE Hours: 40.0 Overview Responsibilities Serve as the primary point of contact for activities related to “Rave Safety Gateway” implementation, developing, testing, and implementing complex edit ch...
Date Posted: 04/28/2026 Recommended
-
Construction Project Manager
Danville , Pennsylvania
Job Title: Construction Project Manager Location: Danville, PA, United States Type: Direct Hire Compensation: $80,000.00 - $120,000.00 Contractor Work Model: Onsite – onsite Responsibilities Lead the buy-out process of subcontracts and purchase orders,...
Date Posted: 04/15/2026 Recommended
-
Field Project Engineer
Sealy, Texas
Job Title: Field Project Engineer Location: Sealy, Texas Type: Contract To Hire Compensation: $50-$70/hour Contractor Work Model: Onsite Field Project Engineer Responsibilities: Construction & Field Execution Lead daily on-site construction and install...
Date Posted: 03/06/2026 Recommended
-
Construction Project Manager
Catoosa, Oklahoma
System One is working with a local client to find a Construction Project Manager in Tulsa Ok. Job Description Responsible for managing and coordinating assigned construction projects from initiation through execution to successful completion. This role...
Date Posted: 04/22/2026 Recommended
-
Senior Information Systems Project Manager
Cary, IL
Job Title: Senior Information Systems Project Manager Location: Cary, IL Type: Contract Compensation: $66.66/hr Work Model: Onsite Hours: 40.0 Responsibilities Lead the team in the development of the project charter and management plan. Direct, manage,...
Date Posted: 04/23/2026 Recommended
-
Civil Field Engineer
Burlington, MA
Job Title: Field Engineer 2 Civil Location: Burlington, MA Type: Contract Compensation: Contractor Work Model: Onsite – onsite Hours: 40.0 Responsibilities Serve as Resident Field Engineer for sewer rehabilitation projects, providing technical support,...
Date Posted: 04/29/2026 Recommended
-
Civil Engineering Designer - Water - Autodesk Civil 3D
San Antonio, TX
Job Title: Civil Engineering Designer - Water - Autodesk Civil 3D Location: San Antonio, TX Type: 6-Month Contract to Permanent Compensation: $35.00-$45.50 Contractor Work Model: Onsite Staff Engineering Technician (5024) System One LLC Position Summar...
Date Posted: 04/27/2026 Recommended
-
Civil Engineering Designer - Water - Autodesk Civil 3D
Houston, TX
Job Title: Civil Engineering Designer - Water - Autodesk Civil 3D Location: Houston, TX Type: 6-Month Contract to Permanent Compensation: $35.00-$45.50 Contractor Work Model: Onsite Staff Engineering Technician (5024) System One LLC Position Summary Th...
Date Posted: 04/27/2026 Recommended
-
Blender/Chemical Plant Operator
East Hanover, New Jersey
Job Title: Blender/Chemical Plant Operator Location: East Hanover, New Jersey Type: Contract Compensation: $28.00 Contractor Work Model: Onsite Hours: M-F 6:00 a.m. - 2:30 p.m., occasional Saturdays Responsibilities Follow Standard Operation Procedures...
Date Posted: 03/09/2026 Recommended
-
Scientist 1
Rockville, MD
Job Title: Scientist 1 Location: Rockville, MD, United States Type: Contract Compensation: Contractor Work Model: Onsite – onsite Hours: 40.0 Security Clearance: Overview Leave placeholder text here for recruiter to input Responsibilities Perform cell ...
Date Posted: 04/29/2026 Recommended
-
Senior Technical Project Manager - Supply Chain
San Antonio, TX
Job Title: Senior Technical Project Manager - Supply Chain Location: San Antonio, TX Job Summary: System One is seeking a Senior Technical Project Manager for a long term opportunity in San Antonio, TX. Responsibilities Lead a large-scale Source-to-Pay...
Date Posted: 04/02/2026 Recommended
-
Construction Project Manager
Berwick , Pennsylvania
Job Title: Construction Project Manager Location: Berwick, PA Type: Direct Hire Compensation: $80,000.00 - $120,000.00 Contractor Work Model: Onsite – onsite Hours: 40.0 hours per week Objective: Manage sheet metal construction projects from start to f...
Date Posted: 04/22/2026 Recommended
-
Staff Engineering Technician - Civil 3D
Jacksonville, FL
Job Title: Staff Engineering Technician - Civil 3D Location: Jacksonville, FL Type: Contract Compensation: Contractor Work Model: Onsite – onsite Hours: 40.0 Responsibilities Support engineering and design teams by developing and modifying technical de...
Date Posted: 04/29/2026 Recommended
-
Quality Coordinator (AWS/CWI)
Salem, Alabama
Job Title: Quality Coordinator (AWS/CWI) Location: Salem, Alabama Type: 3 year Contract Compensation: $50.00 Contractor Work Model: Onsite – onsite Hours: 40.0 Responsibilities Support various Battery Energy Storage System (BESS), Solar, and other proj...
Date Posted: 04/22/2026 Recommended
-
Reactor Enclosure System (RES) Fabrication Manager
Bellevue, WA
Job Title: Reactor Enclosure System (RES) Fabrication Manager Location: Bellevue, WA Type: Contract Compensation: $56.00 - $95.00 Contractor Work Model: Remote Hours: 40.0 Overview System One is seeking to contract with a Reactor Enclosure System (RES)...
Date Posted: 03/17/2026 Recommended
-
EPC Project Controls Manager
Wheatfield, IN
Job Title: EPC Project Controls Manager Location: Hire will start from the Downers Grove, IL office and relocate to Wheatfield, IN once project mobilizes in August 2026. Type: Contract to Direct Hire (possible) Compensation: $TBD (exempt) Contractor Wo...
Date Posted: 02/27/2026 Recommended
-
Chief Estimator
Pittsburgh, PA
Job Title: Chief Estimator Location: Pittsburgh, PA Type: Full-time Compensation: 110-140K Contractor Work Model: Onsite Hours: 40.0 Responsibilities Lead and manage the estimating team, including hiring, training, and performance development Oversee p...
Date Posted: 03/31/2026 Recommended
-
Precast Batch Plant Operator
Pottstown, Pennsylvania
Job Title: Precast Batch Plant Operator Location: Pottstown, PA Type: Contract To Hire Hours: Mid to Second Shift – Hours Vary Based on Production Needs Overview The Precast Batch Plant Operator is responsible for the safe and efficient operation of a ...
Date Posted: 04/20/2026 Recommended