Senior Project Manager - Data Center Construction

Hardeman County, TX

Apply Apply with LinkedIn
Save

Type: Contract

Experience: 10

Category: Construction

Contractor Work Model: Onsite

Brand: System One

Job ID: 378537

Date Posted: 09/24/2026

Shortcut: http://jobs.systemone.com/cQxz6U


Job Title: Senior Project Manager - Data Center Construction
Location: Hardeman County, TX
Type: Contract

System One is seeking an experienced, Senior Project Manager to provide overall leadership for complex, fast-paced mission critical and data center construction projects. This position is accountable for project execution from preconstruction and mobilization through construction, commissioning support, turnover, and closeout while maintaining client's expectations for safety, quality, schedule, financial performance, communication, and client service.

Key Responsibilities

• Provide overall leadership and accountability for assigned mission critical and data center projects from preconstruction through final turnover and closeout.
• Set the project management strategy and establish expectations for execution, reporting, accountability, and decision-making across the project team.
• Maintain command of contract requirements, project scope, owner expectations, specifications, schedule, commercial obligations, and key project risks.
• Lead alignment between Project Management, Field Operations, Preconstruction, Safety, Quality, and Mission Critical leadership.
• Serve as a senior point of contact for owners, developers, design professionals, trade partners, vendors, and executive stakeholders.
• Lead major project meetings, executive updates, risk reviews, and recovery planning as required.
• Anticipate project risks and direct mitigation or recovery plans before impacts become material.
• Escalate significant issues early with clear recommendations, decision requirements, and ownership.

Schedule Management
• Participate in the development, maintenance, and execution of the project Critical Path Method (CPM) schedule.
• Work with the Superintendent, scheduling team, subcontractors, vendors, and project stakeholders to maintain realistic and executable schedules.
• Monitor critical and near-critical activities and identify potential schedule impacts before they become delays.
• Manage look-ahead planning, procurement milestones, design deliverables, inspections, energization, commissioning, and turnover activities.
• Evaluate schedule recovery plans when activities fall behind and drive agreed corrective actions to completion.
• Ensure schedule commitments made during project meetings are documented and followed through.

Financial & Commercial Management
• Maintain overall accountability for project financial performance, margin protection, cash flow, and forecast accuracy.
• Review and approve project budgets, commitments, cost forecasts, projected final costs, contingency usage, and commercial risk exposure.
• Lead resolution of significant owner and subcontractor change orders, claims, scope disputes, and commercial negotiations.
• Ensure the project management team maintains timely and accurate cost-to-complete forecasts, owner billings, subcontractor payments, and change documentation.
• Identify emerging financial risks early and implement corrective actions to protect project and company performance.
• Protect client's contractual and financial interests while maintaining strong client and trade partner relationships.

Procurement & Trade Partner Management
• Establish and oversee the project procurement strategy with emphasis on long-lead mission critical equipment and schedule-sensitive scopes.
• Review major bid packages, scope leveling, subcontractor selection recommendations, and procurement decisions.
• Ensure the project team actively tracks submittals, approvals, fabrication, shipping, delivery, installation, startup, and commissioning milestones.
• Hold subcontractors accountable for contractual scope, schedule, quality, safety, manpower, and commercial commitments.
• Lead resolution of significant trade partner performance issues, scope gaps, and coordination conflicts.
• Ensure subcontractor expectations are clearly established before mobilization and maintained throughout execution.

Design & Technical Coordination
• Coordinate with owners, architects, engineers, commissioning agents, utilities, vendors, and subcontractors to resolve design and constructability issues.
• Manage RFIs, submittals, design clarifications, drawing revisions, and field changes.
• Evaluate design changes for potential schedule, procurement, quality, and cost impacts.
• Participate in design reviews, constructability reviews, pull planning, coordination meetings, and lessons-learned sessions.
• Maintain disciplined document control so project teams are building from current and approved information.
• Support BIM/VDC coordination and clash-resolution activities where applicable.

Safety & Quality
• Demonstrate visible leadership supporting client expectations for safe, high-quality execution.
• Partner with field leadership and safety personnel to maintain a proactive safety culture and reinforce Stop Work Authority.
• Participate in preconstruction safety planning, project safety meetings, audits, and corrective-action processes.
• Support development and implementation of project-specific quality control plans, first-work inspections, testing, deficiency management, and punch-list activities.
• Ensure subcontractors meet client and project-specific safety and quality requirements.
• Promote a build-it-right-the-first-time approach and drive root-cause resolution of recurring issues.

Commissioning & Turnover
• Incorporate commissioning and turnover requirements into project planning from the beginning of the project.
• Coordinate with commissioning agents, vendors, subcontractors, and field teams regarding startup, testing, documentation, and turnover requirements.
• Track prerequisites for energization, equipment startup, functional testing, and Integrated Systems Testing (IST).
• Maintain closeout documentation throughout construction rather than waiting until project completion.
• Drive completion of punch lists, as-builts, O&M manuals, training documentation, warranties, and final turnover packages.

People Leadership & Team Development
• Directly manage and provide day-to-day leadership to Project Managers, Assistant Project Managers, Project Engineers, and other assigned project staff.
• Set clear roles, responsibilities, priorities, and performance expectations for project management personnel.
• Delegate work at the appropriate level while maintaining accountability for quality, timeliness, and results.
• Coach and mentor project staff in project controls, client management, commercial judgment, communication, and leadership.
• Conduct regular one-on-one discussions, performance feedback, and development planning with assigned team members.
• Identify staffing needs, workload imbalances, skill gaps, and succession opportunities and coordinate solutions with Mission Critical leadership.
• Create a project culture where team members raise issues early, take ownership, collaborate across functions, and follow through on commitments.
• Support recruiting, onboarding, development, and retention of high-performing mission critical project personnel.

Mission Critical Systems
The Senior Project Manager should possess working knowledge of mission critical infrastructure and understand the sequencing and coordination associated with systems including:
• Medium- and low-voltage electrical distribution
• Utility and substation interfaces
• Transformers and switchgear
• Generators and standby power systems
• UPS systems
• Busway and power distribution
• Mechanical and electrical equipment
• Cooling systems
• Building automation and controls
• Fire alarm and life-safety systems
• Security and low-voltage systems
• Fuel systems
• Equipment startup and energization
• Integrated Systems Testing (IST)
• Commissioning and turnover
The Senior Project Manager is not expected to personally engineer these systems but must understand their interfaces, dependencies, procurement requirements, installation sequencing, testing requirements, and effect on the overall project schedule and turnover strategy.

Project Controls & Reporting
• Overall project status
• CPM schedule performance and milestone achievement
• Critical and near-critical activities
• Procurement status
• RFI and submittal status
• Change management
• Budget, forecast, and cash flow
• Safety and quality performance
• Staffing and manpower
• Commissioning and turnover readiness
• Key risks, mitigation actions, and client decisions required
• Performance and development of project management staff
• Executive-level risks, decisions, and recovery strategies
Project reporting should allow leadership to understand where the project stands, where it is going, and where intervention may be needed without surprises.

Minimum Qualifications
• Bachelor's degree in Construction Management, Engineering, Architecture, Business, or related field preferred; or 15 years of relevant construction experience in lieu of a degree.
• 10+ years of commercial, industrial, mission critical, or technically complex construction experience, including significant project management responsibility.
• 8+ years in a Project Manager or Senior Project Manager capacity with demonstrated accountability for large or complex projects.
• Demonstrated experience directly managing, developing, and evaluating project management personnel.
• Direct and relevant experience managing data center, mission critical, electrical infrastructure, or similarly complex construction projects.
• Demonstrated success leading large, schedule-driven projects and multi-discipline project teams.
• Strong knowledge of contracts, project financial management, forecasting, procurement, CPM scheduling, change management, and project closeout.
• Strong leadership, communication, negotiation, decision-making, and client-management skills.
• Proficiency with standard construction-management, scheduling, financial reporting, and Microsoft Office platforms.
• Ability to travel to and work from project sites as required.

Preferred Qualifications
• Experience leading mission critical or data center projects in excess of $100 million and/or multiple concurrent projects or workstreams.
• Experience leading accelerated schedules, phased turnover, commissioning activities, and live or operational environments.
• Experience with fast-track, design-assist, and design-build delivery methods.
• Familiarity with critical power, electrical distribution, mechanical cooling, controls, utility infrastructure, and data center commissioning processes.
• Experience with Procore, Bluebeam, Microsoft Project, Primavera P6, or comparable platforms.
• Demonstrated success developing and retaining high-performing project teams.
• OSHA 30 certification.
• PMP, CCM, or other relevant professional certification.

Physical & Travel Requirements
• Ability to regularly work in active construction environments.
• Ability to walk project sites, climb stairs, and access construction areas as required.
• Ability to work in varying weather and site conditions.
• Travel and/or temporary assignment to project locations throughout Texas and other markets may be required.
• Some projects may require extended on-site presence based on project needs.

System One is an equal opportunity employer. Employment decisions are based on qualifications, merit, and business needs.

System One, and its subsidiaries including Joulé and Mountain Ltd., are leaders in delivering outsourced services and workforce solutions across North America. We help clients get work done more efficiently and economically, without compromising quality. System One not only serves as a valued partner for our clients, but we offer eligible employees health and welfare benefits coverage options including medical, dental, vision, spending accounts, life insurance, voluntary plans, as well as participation in a 401(k) plan.


Ref: #192-Precision San Antonio

  • Project Manager - Data Center Construction

    Hardeman County, TX

    Job Title: Project Manager - Data Center Construction Location: Hardeman County, TX Type: Contract Schedule: Onsite System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission critical and data ...

    Date Posted: 09/24/2026 Recommended

  • Construction Project Manager - Data Center

    Lubbock, TX

    Job Title: Project Manager - Data Center Construction Location: Hardeman County, TX Type: Direct Hire Schedule: Onsite - Per Diem System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission crit...

    Date Posted: 09/09/2026 Recommended

  • Construction Project Manager - Data Center

    Fort Worth, TX

    Job Title: Project Manager - Data Center Construction Location: Hardeman County, TX Type: Direct Hire Schedule: Onsite - Per Diem System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission crit...

    Date Posted: 09/09/2026 Recommended

  • Construction Project Manager – Manufacturing

    Schaumburg, Illinois

    Job Title: Construction Project Manager – Manufacturing Location: Schaumburg, Illinois Type: Contract/Consulting Compensation: $75.00 - $100.00 per hour Work Model: Hybrid – onsite and remote Overview The Construction Project Manager is responsible for...

    Date Posted: 08/28/2026 Recommended

  • Construction Manager (Owner's Representative) – Hydroelectric Generation

    Georgetown, CO

    Job Title: Construction Manager (Owner's Representative) – Hydroelectric Generation Location: Georgetown, CO 80444 Type: Contract Compensation: $90.00/hr. Work Model: Onsite Hours: 60.0 hours per week We are seeking an experienced Construction Manager ...

    Date Posted: 09/24/2026 Recommended

  • Startup Manager

    Houston, TX

    Job Title: Deputy Commissioning Manager CQV Location: Houston, TX Type: Contract Compensation: DOE Work Model: Onsite – onsite Hours: 40.0 Security Clearance: Not specified System One is seeking a high-caliber Deputy Commissioning Manager to ensure sta...

    Date Posted: 09/24/2026 Recommended

  • Safety Specialist

    Lubbock, Texas

    Safety Specialist – Data Center Construction Location: Lubbock, TX Start: Immediate Industry: Data Center / Commercial Construction Schedule: Full-Time | Project-Based Per Diem & Mobilization: Provided Position Overview We are seeking an experienced Sa...

    Date Posted: 09/24/2026 Recommended

  • Mechanical Project Manager

    Chandler, AZ

    Mechanical Project Manager – Commercial Construction Location: Phoenix, Arizona Salary: $100,000–$130,000 annually (DOE) Benefits: Comprehensive Benefits Package | Full-Time Position Overview We are seeking an experienced Mechanical Project Manager to ...

    Date Posted: 07/15/2026 Recommended

  • Energy Storage Pre-Construction Manager

    Lake Mary, FL

    Job Title: Energy Storage Pre-Construction Manager Location: Lake Mary, FL Type: Direct Hire Work Model: Onsite – onsite Overview System One is seeking a storage pre-construction manager for a full-time position in Lake Mary, FL. The Manager of Constru...

    Date Posted: 08/06/2026 Recommended

  • Project Engineer III

    Savannah, GA

    Job Title: Project Engineer III Location: Savannah, GA Type: Contract Compensation: $50.00 - $60.00/hr. Work Model: Onsite Hours: 40-50 hours Schedule: 8am-5pm Overview: Our client is looking for a Project Engineer who will be responsible for maintaini...

    Date Posted: 08/05/2026 Recommended

  • Design Manager

    Charlotte, North Carolina

    Job Title: Design Manager Location: Charlotte, North Carolina Type: Direct Hire Compensation: $120,000.00 - $153,000.00 Work Model: Onsite Overview The IS Design Manager is responsible for the design production throughout the life cycle of a project fr...

    Date Posted: 07/21/2026 Recommended

  • Field Quality Completions Manager

    Sherrills Ford, NC

    Field Quality Completions Manager Sherrill Ford, NC Duration: 6 Month contract. Contract to Direct Possible. Direct Hire possible from the start for the right candidate Exempt Pay Rate Range: $48.75 - $59.71 Work Schedule: 5/10s Job Description The Fie...

    Date Posted: 09/23/2026 Recommended

  • HVAC Retrofit Foreman

    Chandler, AZ

    HVAC Retrofit Foreman Location: Phoenix, AZ Pay: Approximately $40 per hour DOE (Depending on Experience) Employment Type: Full-Time About the Position We are seeking an experienced HVAC Retrofit Foreman to lead commercial HVAC retrofit and replacement...

    Date Posted: 08/10/2026 Recommended

  • Design Manager

    Coppell, TX

    Job Title: Design Manager Location: Coppell, TX Type: Direct Hire Compensation: $120,000.00 - $153,000.00 Work Model: Onsite Overview The IS Design Manager is responsible for the design production throughout the life cycle of a project from development...

    Date Posted: 07/21/2026 Recommended

  • Design Manager

    Tempe, AZ

    Job Title: Design Manager Location: Tempe, AZ Type: Direct Hire Compensation: $120,000.00 - $153,000.00 Work Model: Onsite Overview The IS Design Manager is responsible for the design production throughout the life cycle of a project from development h...

    Date Posted: 07/21/2026 Recommended

  • Quality Manager

    Spartanburg, South Carolina

    Job Title: Quality Manager Location: Spartanburg, SC Type: Direct Hire Work Model: Onsite – onsite Responsibilities Lead and embed quality assurance and quality control across complex, project-driven industrial engineering and installation programs. De...

    Date Posted: 09/04/2026 Recommended

  • Senior Electrical Project Engineer

    Houston, Maryland

    Job Title: Senior Electrical Project Engineer Type: Contract To Hire Compensation: $90-95/hr Work Model: Remote – offsite (with 25-50% travel) Overview We are seeking an experienced Senior Electrical Project Engineer to join our Central Engineering tea...

    Date Posted: 09/09/2026 Recommended

  • Senior Electrical Project Engineer

    Columbia, Maryland

    Job Title: Senior Electrical Project Engineer Type: Contract To Hire Compensation: $90-95/hr Work Model: Remote – offsite (with 25-50% travel) Overview We are seeking an experienced Senior Electrical Project Engineer to join our Central Engineering tea...

    Date Posted: 09/09/2026 Recommended

  • Principal Electrical Engineer

    Charlotte, NC

    Principal Electrical Engineer Charlotte, NC Type: Contract to Hire Compensation: $79.32/hr - $100/hr Work Model: Onsite – onsite Hours: 40 hours/weekly minimum System One is seeking a Principal Electrical Engineer for a Contract to Hire opportunity loc...

    Date Posted: 09/21/2026 Recommended

  • Design Manager

    Westmont, IL

    Job Title: Design Manager Location: Westmont, IL Type: Direct Hire Compensation: $130,000.00 - $167,000.00 Work Model: Onsite Overview The IS Design Manager is responsible for the design production throughout the life cycle of a project from developmen...

    Date Posted: 07/21/2026 Recommended

  • Design Manager

    Salt Lake City, UT

    Job Title: Design Manager Location: Salt Lake City, UT Type: Direct Hire Compensation: $120,000.00 - $153,000.00 Work Model: Onsite Overview The IS Design Manager is responsible for the design production throughout the life cycle of a project from deve...

    Date Posted: 07/21/2026 Recommended

  • Design Manager

    Glenolden, Pennsylvania

    Job Title: Design Manager Location: Glenolden, Pennsylvania Type: Direct Hire Compensation: $120,000.00 - $153,000.00 Work Model: Onsite Overview The IS Design Manager is responsible for the design production throughout the life cycle of a project from...

    Date Posted: 07/21/2026 Recommended

  • Design Manager

    Little Rock, AR

    Job Title: Design Manager Location: Little Rock, AR Type: Direct Hire Compensation: $120,000.00 - $153,000.00 Work Model: Onsite Overview The IS Design Manager is responsible for the design production throughout the life cycle of a project from develop...

    Date Posted: 07/21/2026 Recommended

  • Senior Nuclear Engineering Manager

    Pittsburgh, PA

    Job Title: Senior Nuclear Engineering Manager Location: Pittsburgh, PA Type: Direct Hire Work Model: Onsite Hours: 40.0 Responsibilities Lead the planning, execution, and successful delivery of engineering and technical consulting projects within the n...

    Date Posted: 09/22/2026 Recommended

  • Planner

    Bagdad, Arizona

    Job Title: Planner Location: Bagdad, Arizona Type: Contract Work Model: Onsite – onsite Overview The Planner develops, maintains, and monitors project schedules. Responsibilities include schedule development, progress measurement, schedule analysis, cr...

    Date Posted: 07/03/2026 Recommended

  • Principal Project Planner

    Toronto, ON

    Job Title: Principal Project Planner Location: Toronto, ON Type: Direct Hire Compensation: $112,000.00 - $168,000.00 CAD Work Model: Hybrid – Onsite and Remote Responsibilities • Ensure the development of Project Master Schedule and project detailed sc...

    Date Posted: 08/25/2026 Recommended

  • Sr Superintendent

    Denver, CO

    Senior / General Superintendent – Commercial Construction Location: Denver Metro Area, CO Job Type: Full-Time Salary: $110,000–$130,000+ DOE About the Role We are seeking an experienced Senior / General Superintendent to join a growing mid-sized Genera...

    Date Posted: 09/24/2026 Recommended

  • Project Controls Lead

    Bagdad, Arizona

    Job Title: Project Controls Lead Location: Bagdad, Arizona Type: Contract Work Model: Onsite – onsite Overview The Project Controls Lead is responsible for overseeing planning, cost estimation, budgeting, scheduling, reporting, change management, and r...

    Date Posted: 07/03/2026 Recommended

  • Professional Mechanical Engineer

    Englewood, CO

    Mechanical Engineer – HVAC Systems (PE Preferred) Location: Denver, CO Salary: $120,000–$150,000 annually (DOE) Schedule: Full-Time | Hybrid Work Available Relocation Assistance: Available Design High-Performance HVAC Systems We are seeking an experien...

    Date Posted: 07/20/2026 Recommended

  • Structural Designer or Drafter

    Cannonsburg, PA

    Job Title Civil / Structural Designer / Drafter (Junior, Mid-Level, Senior, Lead) Position Overview We are seeking Civil / Structural Designers and Drafters at multiple experience levels to join our growing engineering team. These roles support a wide ...

    Date Posted: 08/25/2026 Recommended