Site Manager - Data Center
Childress, TX
Experience: 0
Category: Construction
Contractor Work Model: Onsite
Brand: System One
Shift: On-Site
Job ID: 343448
Date Posted: 11/17/2025
Shortcut: http://jobs.systemone.com/YT4SNm
Job Title: Site Manager - Data Center
Location: Rural West Texas
Type: Direct Hire
System One is assisting a client in hiring a Site Manager for their Data Center project based in rural West Texas.
What You Will Do
Seeking a highly experienced Local On-Site Manager to lead day-to-day operations for a multi-year AI data center campus. The site includes HV/MV substations and electrical backbone infrastructure built and owned by company, while tenant constructors build and operate their own facilities. Peak site mobilization can exceed 4,000 personnel across multiple trades.
This role represents the company on the ground and ensures the site is safe, lawful, constructible at scale, and welcomed by the local community. The On-Site Manager will coordinate daily field operations, manage interfaces between contractors, utilities, public agencies, and community stakeholders, and report to both functional management and projectized Project/Operations Management.
Key Responsibilities:
-
Site Leadership: Serve as the primary point of contact for all Site Managers, Supervisors, and managers on site. Host and participate in site-wide coordination meetings to ensure clear communication and alignment.
-
Site Governance & Daily Control: Oversee everything happening within the site boundary, including roads, utilities, laydown areas, and logistics. Orchestrate the daily “Plan of the Day” and rapid issue resolution.
-
Stakeholder & Community Interface: Build trusted relationships with local stakeholders and the community to support project goals and promote local benefit.
-
Multi-Prime Coordination: Align company-owned HV/MV substation and collector work with tenant GC/EPC teams.
-
Access, Security, Traffic & Logistics: Manage site access, traffic, and security in collaboration with contractors and stakeholders.
-
Workforce & Community Impact: Coordinate local hiring, training, and housing/transport solutions. Monitor workforce accommodations and conditions if on-site camps are used.
-
EHS Leadership: Enforce company EHS expectations across all contractors and maintain compliance with safety regulations.
-
Permitting & Compliance: Ensure local permits and regulations are adhered to for all hired work.
-
Security & Emergency Management: Develop and post emergency procedures, including “grab and go” protocols.
-
Media & Issues Management: Act as first responder for on-site media inquiries in accordance with corporate communications protocols.
-
Utilities & Interconnections: Coordinate tie-ins, outages, and energization windows with utility, TSP, TDU, gas, water, and telecom providers.
-
Landlord & Lease Management: Enforce lease boundaries, easements, ROWs, and site standards.
-
Cost & Schedule Oversight: Track field productivity, escalate risks early, maintain integrated site master schedule, and log constraints affecting owners, tenants, and agencies.
-
Turnover Readiness: Support Project and Operations Managers during energization events.
-
Site Monitoring & Reporting: Use drone tools and surveillance to track progress and percent complete. Conduct site tours for VIPs and stakeholders, documenting status.
Day-to-Day Responsibilities:
-
Monitor daily activities of all primes and utilities.
-
Track access, EHS, emergency routes, call trees, and weather event responses.
-
Manage interface clashes for laydown, duct banks, outages, road crossings, and energization.
-
Maintain community relations cadence.
-
Oversee traffic, parking, and road repairs.
-
Approve working plans affecting shared assets.
-
Guide incident response and investigations.
-
Maintain issues and commitments register.
-
Support major deliveries and ensure coordination with key stakeholders.
What We Want From You
-
Four-year degree in a technical engineering discipline, with extensive practical experience in high 100s MW electrical and electro-mechanical applications, particularly large site construction.
- 15–20 years of prior site construction experience on large/mega complex projects, with the ability to respond reliably to site issues while living locally (rural/remote community).
-
Working knowledge of construction across multiple electrical and related disciplines within an Integrated Project, including:
-
Utility/Grid studies
-
MEP and IT power supplies for AI data center systems
-
Substation and Generation Automation
-
Deep understanding of company customers’ MV and HV systems, including coordination with 3rd parties and power stakeholders
-
Abilities as a demonstrated team builder for not only safety and security culture, but also morale.
-
Demonstrated success meeting strict SLAs for industrial or data-center customers, by experience with Hands-on with protection & controls, EMS/SCADA, plant controllers, and PQ troubleshooting, with expert 3rd party assistance.
-
Strong vendor/OEM management and contract performance enforcement (LTSA, KPIs, LDs). Excellent incident command, Root Cause Analysis, and stakeholder communication skills.
System One, and its subsidiaries including Joulé, ALTA IT Services, and Mountain Ltd., are leaders in delivering outsourced services and workforce solutions across North America. We help clients get work done more efficiently and economically, without compromising quality. System One not only serves as a valued partner for our clients, but we offer eligible employees health and welfare benefits coverage options including medical, dental, vision, spending accounts, life insurance, voluntary plans, as well as participation in a 401(k) plan.
System One is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy, childbirth, or related medical conditions), sexual orientation, gender identity, age, national origin, disability, family care or medical leave status, genetic information, veteran status, marital status, or any other characteristic protected by applicable federal, state, or local law.
#M-
#LI-
#DI-
Ref: #209-Rowland Houston
-
Site Manager - Data Center
Turkey, TX
Job Title: Site Manager - Data Center Location: Rural West Texas Type: Direct Hire System One is assisting a client in hiring a Site Manager for their Data Center project based in rural West Texas. What You Will Do Seeking a highly experienced Local On...
Date Posted: 11/17/2025 Recommended
-
Project Manager - Data Center
Childress, TX
Job Title: Project Manager - Data Center Location: rural West Texas Type: Direct Hire System One is assisting a client in hiring a Project Manager for their Data Center project based in rural West Texas. What You Will Do Seeking a highly skilled Projec...
Date Posted: 11/17/2025 Recommended
-
Project Manager - Data Center
Turkey, TX
Job Title: Project Manager - Data Center Location: rural West Texas Type: Direct Hire System One is assisting a client in hiring a Project Manager for their Data Center project based in rural West Texas. What You Will Do Seeking a highly skilled Projec...
Date Posted: 11/17/2025 Recommended
-
EHS Specialist Coordinator
Dallas, Texas
Job Title: EHS Specialist Coordinator Location: Dallas, Texas Type: Contract, 3-6 Months Compensation: $49-52 hourly Contractor Work Model: Onsite Hours: 7am to 4pm CST, Monday to Friday. Candidates need to be flexible with shift hours, as they many ne...
Date Posted: 11/24/2025 Recommended
-
Construction Manager-El Paso
El Paso, CA
The data center boom is real—and we’re building the future. Get in on the action and apply today! Job Title: Data Center Construction Manager Location: El Paso, TX Type: Full-Time Project (12-24 months) About the Role We’re seeking a seasoned Data Cent...
Date Posted: 11/17/2025 Recommended
-
Construction Manager -Abilene
Abilene, Texas
The data center boom is real—and we’re building the future. Get in on the action and apply today! Job Title: Data Center Construction Manager Location: Abilene, TX Type: Full-Time Project (12-24 months) About the Role We’re seeking a seasoned Data Cent...
Date Posted: 11/17/2025 Recommended
-
Construction Manager-Port Washington
Port Washington, Wisconsin
The data center boom is real—and we’re building the future. Get in on the action and apply today! Job Title: Data Center Construction Manager Location: Port Washington, WI Type: Full-Time Project (12-24 months) About the Role We’re seeking a seasoned D...
Date Posted: 11/18/2025 Recommended
-
Construction Manager-Saline
Saline, Michigan
The data center boom is real—and we’re building the future. Get in on the action and apply today! Job Title: Data Center Construction Manager Location: Saline, MI Type: Full-Time Project (12-24 months) About the Role We’re seeking a seasoned Data Cente...
Date Posted: 11/18/2025 Recommended
-
Construction Manager -Baton Rouge
Baton Rouge , Louisiana
The data center boom is real—and we’re building the future. Get in on the action and apply today! Job Title: Data Center Construction Manager Location: Baton Rouge, LA Type: Full-Time Project (12-24 months) About the Role We’re seeking a seasoned Data ...
Date Posted: 11/17/2025 Recommended
-
Senior Scheduler
Seattle, Washington
Senior Scheduler Hybrid (must be local to Seattle, WA 98104) System One is seeking a Senior Project Controls Specialist with expertise in Scheduling to join our dynamic team. The ideal candidate will have extensive experience with Primavera P6 and a st...
Date Posted: 12/17/2025 Recommended
-
Senior Estimator
Seattle, Washington
Senior Estimator Hybrid (must be local to Seattle, WA 98104) System One is seeking a Senior Estimator in Seattle, WA to support Seattle City Light in Seattle, WA. This role requires extensive construction estimating expertise and the ability to work on...
Date Posted: 12/17/2025 Recommended
-
Preconstruction Manager
Tulsa, Oklahoma
Job Title: Preconstruction Manager Key Responsibilities: Client Representation: Act as the key liaison between the Preconstruction Team and clients, ensuring all needs and budgetary constraints are met. Budgeting and Value Management: Prepare concept b...
Date Posted: 12/19/2025 Recommended
-
Project Manager
Reno, NV
Project Manager Location: Reno, NV Scope: Manage the construction of two data centers Schedule: Monday–Friday, 7:00 AM – 4:00 PM Pay Rate: $51 per hour Job Description The Field Project Manager is responsible for managing, developing, and successfully ...
Date Posted: 11/26/2025 Recommended
-
Project EHS Manager
Oakland, California
Job Title: Project EHS Manager Location: Oakland, California Type: Direct Hire Compensation: $109000 - $170000 annually Contractor Work Model: Onsite Hours: Add the job’s scheduled days and times (delete if not needed) Security Clearance: List security...
Date Posted: 12/02/2025 Recommended
-
Onboarding Specialist
Boston, Massachusetts
Job Title: Onboarding Specialist Location: United States(EST or CST preferred) Type: Contract Contractor Work Model: Remote Title: Onboarding Specialist ALTA IT Services is a wholly owned subsidiary of System One, a leading provider of specialized work...
Date Posted: 12/23/2025 Recommended
-
Battery Energy Storage System (BESS) Commissioning Manager
South Padre, Texas
Job Title: Battery Energy Storage System Commissioning Manager Location: South Padre Texas Type: Contract Contractor Work Model: Onsite Hours: 50 hours per week plus Start date: around January 1, 2026 Duration 4 months Per diem: $171/day Position Summa...
Date Posted: 11/07/2025 Recommended
-
Senior Technical Project Manager (Salesforce)
Washington, District Of Columbia
Senior Technical Project Manager Remote but must be local to the Washington, DC metro area Compensation: $80-85/hr W2 US Citizenship required to obtain a Public Trust clearance (per government contract) Certifications Required: Salesforce Certification...
Date Posted: 10/15/2025 Recommended
-
Architect II
Norman , OK
Architect II System One is partnering with an architectural firm based in OKC in search of a Project Architect II who plays a key role in leading the coordination and technical execution of architectural projects. This licensed position requires solid ...
Date Posted: 12/02/2025 Recommended
-
Sr. Materials Engineer
Landisville, PA
Job Title: Sr. Materials Engineer Location: Lancaster, PA Type: Direct Hire Work Model: Onsite Hours: Mon-Fri 8:30am-5pm Position Summary The purpose of this role is to develop new processes and continuously improve existing processes at the Material T...
Date Posted: 12/24/2025 Recommended
-
Project Controls Lead
Houston , Texas
Job Title: Project Controls Lead Location: Houston, Texas Type: Contract Contractor Work Model: Onsite System One is seeking a Project Controls Lead on-site in Houston, TX for long-term contract. Candidates must be local to the area. Prior experience i...
Date Posted: 11/12/2025 Recommended
-
Project Manager (Utilities)
Welch, MN
Position: Project Manager (Utilities) Location: Welch, MN Work Arrangement: Onsite Contract Duration: 12-months Pay Rate: $75.00/hr. System One is actively seeking a Project Manager for a long-term contract position supporting cradle-to-grave projects ...
Date Posted: 10/20/2025 Recommended
-
Civil Engineer - Senior
Atlanta, Georgia
Senior Civil Engineer Atlanta, GA Full-Time | Competitive Salary | Hybrid Flexibility | Direct Hire Opportunity A leading employee-owned engineering and design firm is seeking an experienced Senior Civil Engineer to lead complex land development and in...
Date Posted: 11/12/2025 Recommended
-
OSP Engineer
Ironton, OH
Mountain Ltd. has an opening for an OSP Engineer in the Ironton, OH area. Since 1979, Mountain Ltd. has successfully created and supported turnkey engineering solutions for traditional and wireless telecom providers across the United States. We are a n...
Date Posted: 11/18/2025 Recommended
-
Sodium Salt Heat Exchanger Resident
Bellevue, WA
Type: Contract Compensation: $69 - $115 hourly Contractor Work Model: Onsite Sodium Salt Heat Exchanger Resident Engineer Location: Sacramento, CA Employment Type: Contract (System One) Travel: Up to 100% Overview System One is seeking a Sodium Salt He...
Date Posted: 10/27/2025 Recommended
-
Electrical Project Manager
Austin, TX
Job Title: Electrical Project Manager Location: Austin, Texas Type: Direct Hire (18–24 Month Project Duration) System One is assisting a client in hiring a Electrical Project Manager to support a large-scale mission critical project in the Austin, Texa...
Date Posted: 12/03/2025 Recommended
-
Senior Server Administrator
Hershey, PA
Job Title: Senior Server Administrator Location: Hershey, PA Type: Direct Hire Compensation: $90-$115K Contractor Work Model: Onsite / 5 days per week Security Clearance: Must be able to complete a Child Abuse and FBI fingerprinting background check Ou...
Date Posted: 12/16/2025 Recommended
-
Electrical Project Manager
Lockhart, TX
Job Title: Electrical Project Manager Location: Lockhart, Texas Type: Direct Hire (18–24 Month Project Duration) System One is assisting a client in hiring an Electrical Project Manager to support a large-scale mission critical project in the Lockhart,...
Date Posted: 12/03/2025 Recommended
-
Construction Project Manager - Water/Wastewater Plants
Richmond, Virginia
As a Construction Project Manager, you will oversee onsite construction engineering activities for industrial projects, primarily focusing on Water/Wastewater Treatment plants, but also including factories, production facilities, and data centers acros...
Date Posted: 10/23/2025 Recommended
-
Construction Project Manager - Water/Wastewater Plants
Annapolis Junction, Maryland
As a Construction Project Manager, you will oversee onsite construction engineering activities for industrial projects, primarily focusing on Water/Wastewater Treatment plants, but also including factories, production facilities, and data centers acros...
Date Posted: 10/23/2025 Recommended
-
Master Scheduler
Burlington, Texas
Job Title: Master Scheduler Location: Burlington, Texas (76519) Type: Contract Compensation: $75 - $75 hourly Contractor Work Model: Onsite Overview We have an exciting new opportunity for a Master Scheduler to join a fast-paced project team in Burling...
Date Posted: 12/09/2025 Recommended