Project Manager - Data Center Construction

Hardeman County, TX

Apply Apply with LinkedIn
Save

Type: Contract

Experience: 8

Category: Construction

Contractor Work Model: Onsite

Brand: System One

Job ID: 378534

Date Posted: 09/24/2026

Shortcut: http://jobs.systemone.com/Leh52Z


Job Title: Project Manager - Data Center Construction
Location: Hardeman County, TX
Type: Contract
Schedule: Onsite

System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission critical and data center construction projects. This position is responsible for managing projects from preconstruction and mobilization through construction, commissioning support, turnover, and closeout while maintaining client expectations for safety, quality, schedule, cost control, communication, and client service.

The Project Manager serves as a primary point of coordination between the Owner, design team, trade partners, vendors, field leadership, and management. The ideal candidate understands that mission critical construction requires disciplined planning, exceptional documentation, rapid problem solving, schedule accountability, and proactive communication.
This is not a remote, work-from-home position. Projects may be located in remote areas of West Texas and other markets, and the successful candidate must be willing and able to maintain a consistent presence where the work is happening.

This individual must be comfortable operating in an environment where project conditions evolve quickly and where problems are identified early, communicated clearly, and driven to resolution before they affect the project.

Key Responsibilities
Project Leadership & Execution

  • Manage assigned mission critical and data center projects from preconstruction and mobilization through construction, commissioning support, turnover, and closeout.
  • Develop a thorough understanding of contract documents, project scope, owner requirements, specifications, schedule, and commercial obligations.
  • Establish and maintain project execution plans, responsibility matrices, communication protocols, and project controls.
  • Coordinate closely with the Superintendent and field leadership to align project management and field execution.
  • Lead project meetings and ensure decisions, commitments, action items, responsible parties, and due dates are clearly documented and tracked.
  • Maintain strong working relationships with clients, design professionals, trade partners, vendors, authorities having jurisdiction, and other project stakeholders.
  • Identify project risks early and develop practical mitigation plans before they affect safety, quality, schedule, or cost.
  • Escalate significant issues early and provide recommended solutions rather than simply identifying problems.

Schedule Management
  • Participate in the development, maintenance, and execution of the project Critical Path Method (CPM) schedule.
  • Work with the Superintendent, scheduling team, subcontractors, vendors, and project stakeholders to maintain realistic and executable schedules.
  • Monitor critical and near-critical activities and identify potential schedule impacts before they become delays.
  • Manage look-ahead planning, procurement milestones, design deliverables, inspections, energization, commissioning, and turnover activities.
  • Evaluate schedule recovery plans when activities fall behind and drive agreed corrective actions to completion.
  • Ensure schedule commitments made during project meetings are documented and followed through.

Financial & Commercial Management
  • Maintain responsibility for assigned project financial performance and accurate forecasting.
  • Develop and manage project budgets, commitments, cost forecasts, change management, and projected final costs.
  • Review subcontractor and vendor proposals for completeness, scope alignment, and commercial reasonableness.
  • Prepare, negotiate, document, and manage owner and subcontractor change orders.
  • Maintain accurate cost-to-complete forecasts and identify financial risks early.
  • Review subcontractor applications for payment and support preparation of owner billing.
  • Monitor contingency usage, allowances, procurement exposure, cash flow, and unresolved commercial issues.
  • Protect client's contractual and financial interests while maintaining professional relationships with clients and trade partners.

Procurement & Trade Partner Management
  • Develop and maintain procurement logs identifying long-lead materials and equipment, submittal requirements, release dates, fabrication durations, and required-on-site dates.
  • Coordinate procurement of critical mission critical equipment and infrastructure.
  • Track submittals, approvals, fabrication, shipping, delivery, installation, startup, and commissioning milestones.
  • Manage subcontractor performance against contractual scope, schedule, quality, safety, manpower, and documentation requirements.
  • Identify scope gaps and coordination conflicts before subcontract award whenever possible.
  • Ensure subcontractors understand project-specific expectations before mobilization.

Design & Technical Coordination
  • Coordinate with owners, architects, engineers, commissioning agents, utilities, vendors, and subcontractors to resolve design and constructability issues.
  • Manage RFIs, submittals, design clarifications, drawing revisions, and field changes.
  • Evaluate design changes for potential schedule, procurement, quality, and cost impacts.
  • Participate in design reviews, constructability reviews, pull planning, coordination meetings, and lessons-learned sessions.
  • Maintain disciplined document control so project teams are building from current and approved information.
  • Support BIM/VDC coordination and clash-resolution activities where applicable.

Safety & Quality
  • Demonstrate visible leadership supporting client expectations for safe, high-quality execution.
  • Partner with field leadership and safety personnel to maintain a proactive safety culture and reinforce Stop Work Authority.
  • Participate in preconstruction safety planning, project safety meetings, audits, and corrective-action processes.
  • Support development and implementation of project-specific quality control plans, first-work inspections, testing, deficiency management, and punch-list activities.
  • Ensure subcontractors meet client and project-specific safety and quality requirements.
  • Promote a build-it-right-the-first-time approach and drive root-cause resolution of recurring issues.

Commissioning & Turnover
  • Incorporate commissioning and turnover requirements into project planning from the beginning of the project.
  • Coordinate with commissioning agents, vendors, subcontractors, and field teams regarding startup, testing, documentation, and turnover requirements.
  • Track prerequisites for energization, equipment startup, functional testing, and Integrated Systems Testing (IST).
  • Maintain closeout documentation throughout construction rather than waiting until project completion.
  • Drive completion of punch lists, as-builts, O&M manuals, training documentation, warranties, and final turnover packages.

People Leadership & Team Development
  • Provide day-to-day direction and task coordination to Assistant Project Managers, Project Engineers, and project administrative staff assigned to the project.
  • Clearly communicate priorities, deadlines, and expectations and follow through on assigned commitments.
  • Support the development of less-experienced team members through coaching, knowledge sharing, and constructive feedback.
  • Collaborate with the Senior Project Manager and Mission Critical leadership on staffing needs, workload, and team performance.

Mission Critical Systems
The Project Manager would need to possess working knowledge of mission critical infrastructure and understand the sequencing and coordination associated with systems including:
  • Medium- and low-voltage electrical distribution
  • Utility and substation interfaces
  • Transformers and switchgear
  • Generators and standby power systems
  • UPS systems
  • Busway and power distribution
  • Mechanical and electrical equipment
  • Cooling systems
  • Building automation and controls
  • Fire alarm and life-safety systems
  • Security and low-voltage systems
  • Fuel systems
  • Equipment startup and energization
  • Integrated Systems Testing (IST)
  • Commissioning and turnover
The Project Manager is not expected to personally engineer these systems but must understand their interfaces, dependencies, procurement requirements, installation sequencing, testing requirements, and effect on the overall project schedule and turnover strategy.

Project Controls & Reporting
• Overall project status
• CPM schedule performance and milestone achievement
• Critical and near-critical activities
• Procurement status
• RFI and submittal status
• Change management
• Budget, forecast, and cash flow
• Safety and quality performance
• Staffing and manpower
• Commissioning and turnover readiness
• Key risks, mitigation actions, and client decisions required

Project reporting should allow leadership to understand where the project stands, where it is going, and where intervention may be needed without surprises.

Minimum Qualifications
  • Bachelor's degree in Construction Management, Engineering, Architecture, or related field preferred; or 8 years of equivalent construction experience in lieu of a degree.
  • 5+ years of commercial, industrial, mission critical, or technically complex construction experience.
  • Previous Project Manager, Assistant Project Manager, Project Engineer, or similar project-management experience with increasing responsibility.
  • Demonstrated experience managing subcontractors, project controls, and multiple project stakeholders.
  • Strong knowledge of construction drawings, specifications, contracts, RFIs, submittals, change orders, procurement, and project closeout.
  • Working knowledge of construction scheduling and CPM principles.
  • Strong understanding of project financial management and cost forecasting.
  • Strong written and verbal communication, organization, and problem-solving skills.
  • Proficiency with standard construction-management software and Microsoft Office applications.
  • Ability to travel to and work from project sites as required.

Preferred Qualifications
  • Direct experience with data centers, mission critical facilities, substations, electrical infrastructure, industrial facilities, or other high-reliability environments.
  • Experience managing projects in excess of $50 million.
  • Experience with fast-track and design-assist/design-build delivery methods.
  • Experience with Procore, Bluebeam, Microsoft Project, Primavera P6, or comparable platforms.
  • Familiarity with BIM/VDC coordination.
  • Experience with commissioning, equipment energization, and Integrated Systems Testing.
  • OSHA 10 or 30 certification.

What Success Looks Like
  • Own the outcome. Take responsibility for results rather than waiting for someone else to solve problems.
  • Communicate early. Bad news does not improve with age.
  • Bring solutions. When escalating an issue, provide a recommended path forward whenever possible.
  • Know the details. Maintain command of the contract, schedule, cost, procurement, risks, and major project commitments.
  • Plan ahead. Mission critical projects are won or lost weeks and months before work reaches the field.
  • Support field execution. Project Management and Field Operations operate as one project team.
  • Protect relationships. Treat clients, designers, subcontractors, and vendors professionally while protecting client's interests.
  • Hold people accountable. Commitments must have an owner and a completion date.
  • Maintain urgency without creating chaos.
  • No surprises. Never surprise the client or leadership with an issue that could have been communicated earlier.

Physical & Travel Requirements
  • Ability to regularly work in active construction environments.
  • Ability to walk project sites, climb stairs, and access construction areas as required.
  • Ability to work in varying weather and site conditions.
  • Travel and/or temporary assignment to project locations throughout Texas and other markets may be required.
  • Some projects may require extended on-site presence based on project needs.

Our client offers the opportunity to join a growing mission critical construction team with strong executive support and significant opportunities for professional growth.
  • Competitive compensation
  • Excellent employee benefits
  • A collaborative and experienced leadership team
  • The opportunity to lead major data center construction projects
  • A culture built around accountability, integrity, teamwork, and execution
  • Opportunities to help shape and grow our mission critical business

System One is an equal opportunity employer. Employment decisions are based on qualifications, merit, and business needs.

System One, and its subsidiaries including Joulé and Mountain Ltd., are leaders in delivering outsourced services and workforce solutions across North America. We help clients get work done more efficiently and economically, without compromising quality. System One not only serves as a valued partner for our clients, but we offer eligible employees health and welfare benefits coverage options including medical, dental, vision, spending accounts, life insurance, voluntary plans, as well as participation in a 401(k) plan.

#M-
#LI-

Ref: #192-Precision San Antonio

  • Construction Project Manager - Data Center

    Fort Worth, TX

    Job Title: Project Manager - Data Center Construction Location: Hardeman County, TX Type: Direct Hire Schedule: Onsite - Per Diem System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission crit...

    Date Posted: 09/09/2026 Recommended

  • Construction Project Manager - Data Center

    Lubbock, TX

    Job Title: Project Manager - Data Center Construction Location: Hardeman County, TX Type: Direct Hire Schedule: Onsite - Per Diem System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission crit...

    Date Posted: 09/09/2026 Recommended

  • Senior Project Manager - Data Center Construction

    Hardeman County, TX

    Job Title: Senior Project Manager - Data Center Construction Location: Hardeman County, TX Type: Contract System One is seeking an experienced, Senior Project Manager to provide overall leadership for complex, fast-paced mission critical and data cente...

    Date Posted: 09/24/2026 Recommended

  • Construction Project Manager – Manufacturing

    Schaumburg, Illinois

    Job Title: Construction Project Manager – Manufacturing Location: Schaumburg, Illinois Type: Contract/Consulting Compensation: $75.00 - $100.00 per hour Work Model: Hybrid – onsite and remote Overview The Construction Project Manager is responsible for...

    Date Posted: 08/28/2026 Recommended

  • Construction Manager (Owner's Representative) – Hydroelectric Generation

    Georgetown, CO

    Job Title: Construction Manager (Owner's Representative) – Hydroelectric Generation Location: Georgetown, CO 80444 Type: Contract Compensation: $90.00/hr. Work Model: Onsite Hours: 60.0 hours per week We are seeking an experienced Construction Manager ...

    Date Posted: 09/24/2026 Recommended

  • Startup Manager

    Houston, TX

    Job Title: Deputy Commissioning Manager CQV Location: Houston, TX Type: Contract Compensation: DOE Work Model: Onsite – onsite Hours: 40.0 Security Clearance: Not specified System One is seeking a high-caliber Deputy Commissioning Manager to ensure sta...

    Date Posted: 09/24/2026 Recommended

  • Safety Specialist

    Lubbock, Texas

    Safety Specialist – Data Center Construction Location: Lubbock, TX Start: Immediate Industry: Data Center / Commercial Construction Schedule: Full-Time | Project-Based Per Diem & Mobilization: Provided Position Overview We are seeking an experienced Sa...

    Date Posted: 09/24/2026 Recommended

  • Energy Storage Pre-Construction Manager

    Lake Mary, FL

    Job Title: Energy Storage Pre-Construction Manager Location: Lake Mary, FL Type: Direct Hire Work Model: Onsite – onsite Overview System One is seeking a storage pre-construction manager for a full-time position in Lake Mary, FL. The Manager of Constru...

    Date Posted: 08/06/2026 Recommended

  • Construction Superintendent

    Merrit Island, FL

    Construction Field Superintendent Location: Merritt Island, FL Type: Contract / On-site Compensation: Starting at $57/hour and up to $59 per hour Schedule: 40+ hours/week | Monday–Friday Position Overview We are seeking an experienced Construction Fiel...

    Date Posted: 07/17/2026 Recommended

  • Construction Superintendent

    El Paso, Texas

    Construction Field Superintendent Location: El Paso, TX Type: Contract / On-site Compensation: Starting at $60 and up to $62 per hour Schedule: 40+ hours/week | Monday–Friday / Position Overview We are seeking an experienced Construction Field Superint...

    Date Posted: 07/17/2026 Recommended

  • HVAC Retrofit Foreman

    Chandler, AZ

    HVAC Retrofit Foreman Location: Phoenix, AZ Pay: Approximately $40 per hour DOE (Depending on Experience) Employment Type: Full-Time About the Position We are seeking an experienced HVAC Retrofit Foreman to lead commercial HVAC retrofit and replacement...

    Date Posted: 08/10/2026 Recommended

  • Engineering Manager / Assistant Project Manager

    Lee County, Texas

    Job Title: Engineering Manager Location: Lee County, Texas Type: Contract Compensation: TBD based on experience Work Model: Onsite – onsite Hours: 40.0 hours per week Overview System One is seeking a high-caliber Engineering Manager to support a combin...

    Date Posted: 08/27/2026 Recommended

  • Mechanical Project Manager

    Chandler, AZ

    Mechanical Project Manager – Commercial Construction Location: Phoenix, Arizona Salary: $100,000–$130,000 annually (DOE) Benefits: Comprehensive Benefits Package | Full-Time Position Overview We are seeking an experienced Mechanical Project Manager to ...

    Date Posted: 07/15/2026 Recommended

  • Project Engineer

    Frederick, Maryland

    Job Title: Project Engineer Location: Frederick, Maryland Type: Direct Hire Compensation: $80,000.00 - $120,000.00 Onsite Position overview We’re hiring a Project Engineer to support electrical construction projects by coordinating technical and admini...

    Date Posted: 07/21/2026 Recommended

  • Construction Project Manager III

    Merrit Island, FL

    Construction Project Manager III Location: Merritt Island, FL Type: Contract / On-site Pay Rate: starting at $64 and up to $66 per hour 40hrs a week We are seeking an experienced Construction Project Manager to oversee the planning, execution, and succ...

    Date Posted: 07/17/2026 Recommended

  • Project Engineer

    Denver, CO

    Commercial Construction Project Engineer – Denver Metro Commercial Construction Project Engineer Location: Denver Metro Area, CO Job Type: Full-Time Salary: $70,000–$85,000+ DOE About the Role We are seeking a motivated Commercial Construction Project ...

    Date Posted: 09/24/2026 Recommended

  • Electrical Controls Engineer

    Kansas City, MO

    Electrical Controls Engineer Full-Time | Kansas City, MO Travel: Up to 50% (including occasional extended trips) Position Overview Seeking an experienced Electrical Controls Engineer to support turnkey control system projects. This role involves collab...

    Date Posted: 08/28/2026 Recommended

  • Sr. Construction Superintendent – Luxury Interiors

    New York, NY

    Job Title: Senior Superintendent – Luxury Residential Interiors Location: New York City, NY(near Hudson Yards / Hell's Kitchen) Type: Direct Hire Industry: Residential Construction (High-End/Luxury Interiors) Compensation: $140,000 - $165,000 annually ...

    Date Posted: 09/08/2026 Recommended

  • Project Coordinator/Shift Supervisor

    Lynchburg, Virginia

    Coordinate and supervise all activities associated with the reactor cavity seal table during Pressurized Water Reactor (PWR) refueling outages. Direct installation, operation, maintenance, and removal of seal table systems while ensuring personnel safe...

    Date Posted: 07/01/2026 Recommended

  • Sr Superintendent

    Denver, CO

    Senior / General Superintendent – Commercial Construction Location: Denver Metro Area, CO Job Type: Full-Time Salary: $110,000–$130,000+ DOE About the Role We are seeking an experienced Senior / General Superintendent to join a growing mid-sized Genera...

    Date Posted: 09/24/2026 Recommended

  • Quality Manager

    Spartanburg, South Carolina

    Job Title: Quality Manager Location: Spartanburg, SC Type: Direct Hire Work Model: Onsite – onsite Responsibilities Lead and embed quality assurance and quality control across complex, project-driven industrial engineering and installation programs. De...

    Date Posted: 09/04/2026 Recommended

  • Project Engineer III

    Savannah, GA

    Job Title: Project Engineer III Location: Savannah, GA Type: Contract Compensation: $50.00 - $60.00/hr. Work Model: Onsite Hours: 40-50 hours Schedule: 8am-5pm Overview: Our client is looking for a Project Engineer who will be responsible for maintaini...

    Date Posted: 08/05/2026 Recommended

  • Field Quality Completions Manager

    Sherrills Ford, NC

    Field Quality Completions Manager Sherrill Ford, NC Duration: 6 Month contract. Contract to Direct Possible. Direct Hire possible from the start for the right candidate Exempt Pay Rate Range: $48.75 - $59.71 Work Schedule: 5/10s Job Description The Fie...

    Date Posted: 09/23/2026 Recommended

  • Project Executive-Commercial Construction Projects

    Charlotte, North Carolina

    Job Title: Project Executive-Commercial Construction Projects Location: Charlotte, North Carolina Type: Direct Hire Compensation: $140-175k base Contractor Work Model: Hybrid – onsite and remote Overview The Project Executive for Integrated Solutions -...

    Date Posted: 08/12/2026 Recommended

  • Structural Designer or Drafter

    Cannonsburg, PA

    Job Title Civil / Structural Designer / Drafter (Junior, Mid-Level, Senior, Lead) Position Overview We are seeking Civil / Structural Designers and Drafters at multiple experience levels to join our growing engineering team. These roles support a wide ...

    Date Posted: 08/25/2026 Recommended

  • Safety Professional

    Cheyenne, WY

    J Construction Safety Professional – Data Center Project Location: Northern Colorado- jobsite in Cheyenne to start Pay: $40–$50 per hour (based on experience) Job Type: Full-Time | Project-Based Position Overview We are seeking an experienced Construct...

    Date Posted: 09/22/2026 Recommended

  • Construction Project Manager

    Pittsburgh, Pennsylvania

    Job Title: Construction Project Manager Location: Pittsburgh, PA Type: Direct Hire Work Model: Onsite – onsite Hours: 40.0 Responsibilities Oversight for all phases of the construction project from initiation to execution and completion. Develop detail...

    Date Posted: 07/14/2026 Recommended

  • Nuclear Engineering Program Specialist and Procedure Writer Engineer

    Bellevue, Washington

    Nuclear Engineering Plant Program Specialist / Nuclear Procedure Writer Job Type: Contract - Remote Schedule: 40 hours/week System One is seeking an experienced Nuclear Engineering Plant Program Specialist / Nuclear Procedure Writer to support the deve...

    Date Posted: 07/29/2026 Recommended

  • Principal Project Planner

    Toronto, ON

    Job Title: Principal Project Planner Location: Toronto, ON Type: Direct Hire Compensation: $112,000.00 - $168,000.00 CAD Work Model: Hybrid – Onsite and Remote Responsibilities • Ensure the development of Project Master Schedule and project detailed sc...

    Date Posted: 08/25/2026 Recommended

  • EH&S Occupational Health Professional - Hygienist

    Winnemucca, Nevada

    Job Title: EH&S Occupational Health Professional - Hygienist Location: Winnemucca, NV Type: 12 month Contract Compensation: $69-89/hr Work Model: Onsite Per Diem 57 hour work week Mobilization/Demobilization Covered Trips Home Covered 3 Weeks on, 1 Wee...

    Date Posted: 09/23/2026 Recommended