Project Manager -- Data Center

South Hill, NC

Apply Apply with LinkedIn
Save

Type: Direct-Hire

Experience: 0

Category: Construction

Contractor Work Model: Onsite

Brand: System One

Compensation Range: 85000.00 - 145000.00

Job ID: 379782

Date Posted: 10/01/2026

Shortcut: http://jobs.systemone.com/FkDFlC


Job Title: Project Manager -- Data Center

Location: N. Charlotte, NC

Type: Direct Hire

Compensation: $85,000.00 - $145,000.00

Work Model: Onsite – onsite

Hours: 40.0

Security Clearance: Not specified

Overview

Responsibilities

  • Oversee large-scale, hyperscale data center electrical construction projects from pre-construction through completion.
  • Manage multiple electrical construction projects, ensuring performance, schedule, budget, labor, and profitability.
  • Coordinate project meetings and communicate regularly with clients, contractors, and internal teams.
  • Review project drawings, specifications, contracts, and construction documents.
  • Resolve construction challenges and coordinate field installation activities.
  • Prepare and manage RFIs, submittals, and project documentation.
  • Establish project budgets and schedules, review estimates, and assist with project setup.
  • Procure major electrical materials and coordinate subcontractor scopes and procurement.
  • Coordinate with BIM/VDC teams on project planning and execution, review drawings for quality control.
  • Develop and maintain project prefabrication plans and coordinate logistics and delivery.
  • Create and update project schedules, monitor project milestones, and coordinate workforce planning.
  • Oversee subcontractor performance, scope of work, and billing processes.
  • Support safety and quality control plans, ensure compliance with safety standards, and monitor code adherence.
  • Track project costs, manage change orders, and prepare project progress reports.
  • Develop strong relationships with project stakeholders, including owners, general contractors, vendors, and trade partners.
Requirements
  • 5–10+ years of project management experience in mission-critical electrical construction, preferably data centers.
  • Bachelor's degree in Construction Management or related field preferred; equivalent construction experience may be considered.
  • Strong understanding of electrical construction and field operations.
  • Experience with project budgeting, cost tracking, scheduling, and change orders.
  • Ability to review construction drawings and specifications.
  • Strong subcontractor and vendor management skills.
  • Leadership, communication, organization, and problem-solving abilities.
  • Ability to manage multiple priorities and projects.
  • Experience with financial and construction software, including Spectrum or similar tools.
  • Proficiency with Microsoft Excel, Word, PowerPoint, Bluebeam Revu, and scheduling/estimating software.
  • Work environment includes both office and active construction sites, requiring safety compliance and physical navigation of sites.

System One, and its subsidiaries including Joulé and Mountain Ltd., are leaders in delivering outsourced services and workforce solutions across North America. We help clients get work done more efficiently and economically, without compromising quality. System One not only serves as a valued partner for our clients, but we offer eligible employees health and welfare benefits coverage options including medical, dental, vision, spending accounts, life insurance, voluntary plans, as well as participation in a 401(k) plan.

System One is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy, childbirth, or related medical conditions), sexual orientation, gender identity, age, national origin, disability, family care or medical leave status, genetic information, veteran status, marital status, or any other characteristic protected by applicable federal, state, or local law.



Ref: #671-STS Charlotte

  • Project Manager

    Cayce, SC

    Job Title: Project Manager Location: Cayce, SC Type: Direct Hire Compensation: 90,000- 115,000 Work Model: Onsite – onsite Hours: 40.0 Security Clearance: Not specified Overview • Manage commercial electrical construction projects from preconstructi...

    Date Posted: 09/22/2026 Recommended

  • Project Manager - Data Center Construction

    Hardeman County, TX

    Job Title: Project Manager - Data Center Construction Location: Hardeman County, TX Type: Contract Schedule: Onsite System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission critical and data ...

    Date Posted: 09/24/2026 Recommended

  • Construction Project Manager - Data Center

    Lubbock, TX

    Job Title: Project Manager - Data Center Construction Location: Hardeman County, TX Type: Direct Hire Schedule: Onsite - Per Diem System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission crit...

    Date Posted: 09/09/2026 Recommended

  • Construction Project Manager - Data Center

    Fort Worth, TX

    Job Title: Project Manager - Data Center Construction Location: Hardeman County, TX Type: Direct Hire Schedule: Onsite - Per Diem System One is seeking an experienced, Project Manager to lead the successful execution of complex, fast-paced mission crit...

    Date Posted: 09/09/2026 Recommended

  • Sr. Project Manager -- Data Center

    Charlotte, NC

    Job Title: Sr. Project Manager -- Data Center Location: Charlotte, NC Type: Direct Hire Compensation: $125,000-$200,000 Work Model: Onsite – onsite Hours: 40.0 Security Clearance: Not specified in the provided information Overview Responsibilities Revi...

    Date Posted: 10/01/2026 Recommended

  • Principal Electrical Engineer

    Charlotte, NC

    Principal Electrical Engineer Charlotte, NC Type: Contract to Hire Compensation: $79.32/hr - $100/hr Work Model: Onsite – onsite Hours: 40 hours/weekly minimum System One is seeking a Principal Electrical Engineer for a Contract to Hire opportunity loc...

    Date Posted: 09/21/2026 Recommended

  • Electrical Controls Engineer

    Kansas City, MO

    Electrical Controls Engineer Full-Time | Kansas City, MO Travel: Up to 50% (including occasional extended trips) Position Overview Seeking an experienced Electrical Controls Engineer to support turnkey control system projects. This role involves collab...

    Date Posted: 08/28/2026 Recommended

  • Construction Project Manager – Manufacturing

    Schaumburg, Illinois

    Job Title: Construction Project Manager – Manufacturing Location: Schaumburg, Illinois Type: Contract/Consulting Compensation: $75.00 - $100.00 per hour Work Model: Hybrid – onsite and remote Overview The Construction Project Manager is responsible for...

    Date Posted: 08/28/2026 Recommended

  • Construction Superintendent

    Merrit Island, FL

    Construction Field Superintendent Location: Merritt Island, FL Type: Contract / On-site Compensation: Starting at $57/hour and up to $59 per hour Schedule: 40+ hours/week | Monday–Friday Position Overview We are seeking an experienced Construction Fiel...

    Date Posted: 07/17/2026 Recommended

  • Construction Superintendent

    El Paso, Texas

    Construction Field Superintendent Location: El Paso, TX Type: Contract / On-site Compensation: Starting at $60 and up to $62 per hour Schedule: 40+ hours/week | Monday–Friday / Position Overview We are seeking an experienced Construction Field Superint...

    Date Posted: 07/17/2026 Recommended

  • Senior Project Manager - Data Center Construction

    Hardeman County, TX

    Job Title: Senior Project Manager - Data Center Construction Location: Hardeman County, TX Type: Contract System One is seeking an experienced, Senior Project Manager to provide overall leadership for complex, fast-paced mission critical and data cente...

    Date Posted: 09/24/2026 Recommended

  • Electrical Estimator

    Mechanicsburg, PA

    Job Title: Electrical Estimator Location: Mechanicsburg, PA Type: Direct Hire Work Model: Onsite Hours: 40.0 Responsibilities Analyze project drawings, specifications, and other documentation to prepare comprehensive cost estimates for electrical work....

    Date Posted: 09/24/2026 Recommended

  • Material Manager III

    Wheatfield, IN

    Material Manager III Wheatfield, IN Type: 6- month contract Compensation: Work Model: Onsite – onsite Hours: 40.0 System One is seeking a Material Manager III to join our team for a 6-month contract in Wheatfield, IN. Responsibilities • Implements Proc...

    Date Posted: 09/30/2026 Recommended

  • Senior Construction Electrical Engineer

    Lake Mary, FL

    Job Title: Senior Construction Electrical Engineer Location: Lake Mary, FL 32809 Type: Direct Hire Compensation: $115,000 - $135,000/yr Work Model: Onsite Hours: 40.0 Security Clearance: Not specified Overview System One is seeking a Senior Constructio...

    Date Posted: 07/22/2026 Recommended

  • Construction Permitting Coordinator

    Merrit Island, FL

    Job Title: Construction Permitting Coordinator Location: Merritt Island, FL Type: Contract / On-site Pay Rate: up to $39 - $40 per hour Schedule: 40 hours/week | 8 hours/day | Monday–Friday We are seeking an experienced Construction Permitting Coordina...

    Date Posted: 07/17/2026 Recommended

  • Construction Manager (Owner's Representative) – Hydroelectric Generation

    Georgetown, CO

    Job Title: Construction Manager (Owner's Representative) – Hydroelectric Generation Location: Georgetown, CO 80444 Type: Contract Compensation: $90.00/hr. Work Model: Onsite Hours: 60.0 hours per week We are seeking an experienced Construction Manager ...

    Date Posted: 09/24/2026 Recommended

  • Energy Storage Pre-Construction Manager

    Lake Mary, FL

    Job Title: Energy Storage Pre-Construction Manager Location: Lake Mary, FL Type: Direct Hire Work Model: Onsite – onsite Overview System One is seeking a storage pre-construction manager for a full-time position in Lake Mary, FL. The Manager of Constru...

    Date Posted: 08/06/2026 Recommended

  • Electrical Estimator

    Spartanburg, South Carolina

    Job Title: Electrical Estimator Location: Spartanburg, SC Type: Direct Hire Work Model: Hybrid – onsite and remote Responsibilities Analyze blueprints, specifications, and project documentation to prepare accurate cost and labor estimates. Support the ...

    Date Posted: 09/04/2026 Recommended

  • Senior Electrical Engineer (Data Center)

    Cary, North Carolina

    Job Title: Senior Electrical Engineer (Data Center) Location: Cary, NC Type: 6 month Contract Compensation: $95.00 Responsibilities Lead efforts to deliver detailed design of large-scale data center environments while following all company, client and ...

    Date Posted: 09/21/2026 Recommended

  • Electrical Designer

    Omaha, NE

    Job Title: Electrical Designer Location: Omaha, NE 68114 Type: 6-month contract with possibility of conversion to permanent Compensation: $55.00 (DOE) Work Model: Onsite Hours: 40 hours/week Security Clearance: Not specified Overview System One is seek...

    Date Posted: 09/01/2026 Recommended

  • Electrical Engineer (Data Center)

    Cary, North Carolina

    Job Title: Electrical Engineer (Data Center) Location: Cary, NC Type: 6 month Contract Compensation: $70.00 - $76.00 Work Model: Onsite – onsite Responsibilities Lead efforts to deliver detailed design of large-scale data center environments while foll...

    Date Posted: 09/21/2026 Recommended

  • Senior Electrical Designer

    Charlotte, NC

    Job Title: Senior Electrical Designer Location: Charlotte, NC Type: Direct Hire Compensation: $150,000.00 - $170,000.00 Responsibilities Lead electrical design activities and provide technical direction within the electrical discipline for power genera...

    Date Posted: 09/11/2026 Recommended

  • Field Quality Completions Manager

    Sherrills Ford, NC

    Field Quality Completions Manager Sherrill Ford, NC Duration: 6 Month contract. Contract to Direct Possible. Direct Hire possible from the start for the right candidate Exempt Pay Rate Range: $48.75 - $59.71 Work Schedule: 5/10s Job Description The Fie...

    Date Posted: 09/23/2026 Recommended

  • Sr. Construction Superintendent – Luxury Interiors

    New York, NY

    Job Title: Senior Superintendent – Luxury Residential Interiors Location: New York City, NY(near Hudson Yards / Hell's Kitchen) Type: Direct Hire Industry: Residential Construction (High-End/Luxury Interiors) Compensation: $140,000 - $165,000 annually ...

    Date Posted: 09/08/2026 Recommended

  • Field Designer

    Eau Claire, Wisconsin

    Job Title: Field Designer Location: Eau Claire, Wisconsin Type: 12 month Contract Compensation: $30.00 - $31.50 per hour Work Model: Hybrid – onsite and remote Responsibilities • Design and manage electric distribution projects for new and existing cus...

    Date Posted: 08/04/2026 Recommended

  • Startup Manager

    Houston, TX

    Job Title: Deputy Commissioning Manager CQV Location: Houston, TX Type: Contract Compensation: DOE Work Model: Onsite – onsite Hours: 40.0 Security Clearance: Not specified System One is seeking a high-caliber Deputy Commissioning Manager to ensure sta...

    Date Posted: 09/24/2026 Recommended

  • Engineer / Project Manager Engineer

    Denver, Colorado

    Job Title: Engineer / Project Manager Engineer Location: Denver, Colorado Type: 12 month Contract Compensation: $65.00 - $68.00 Work Model: Hybrid – onsite and remote Responsibilities Manage capital engineering projects from initiation through completi...

    Date Posted: 09/09/2026 Recommended

  • Engineering Director

    Orlando, Florida

    Job Title: Engineering Director Location: Orlando, Florida Type: Direct Hire Compensation: $150,000 to $200,000 Contractor Work Model: Hybrid – onsite and remote Overview The Director of Engineering is responsible for directing, overseeing, and utilizi...

    Date Posted: 09/29/2026 Recommended

  • Construction Project Manager III

    Merrit Island, FL

    Construction Project Manager III Location: Merritt Island, FL Type: Contract / On-site Pay Rate: starting at $64 and up to $66 per hour 40hrs a week We are seeking an experienced Construction Project Manager to oversee the planning, execution, and succ...

    Date Posted: 07/17/2026 Recommended

  • Sr Piping Designer / Checker

    Pittsburgh, PA

    Job Title: SR Piping Designer/checker Location: Pittsburgh, PA Type: Contract To Hire Compensation: $53.00 - $57.00 Work Model: Hybrid – onsite and remote Overview Responsibilities Produce design layouts and finished drawings for piping systems, ensuri...

    Date Posted: 09/24/2026 Recommended