Estimator-Data Center Construction
Houston, Texas
Experience: 0
Category: Construction
Contractor Work Model: Onsite
Brand: System One
Compensation Range: 64.00 - 98.00 Per Hour
Job ID: 347240
Date Posted: 04/02/2026
Shortcut: http://jobs.systemone.com/l2rj7F
Job Title: Estimator-Data Center Construction
Location: Houston, Texas
Type: Contract
Compensation: $64 - $98/hr
+(depending on experience)
Contractor Work Model: Onsite
Overview
We are seeking an experienced Estimator to support a growing Data Center portfolio. This role is responsible for developing accurate, data-driven cost estimates for competitive tenders.
The Estimator will translate technical scope and engineering documentation into structured, reliable pricing models that reflect company’s delivery approach, market conditions, and execution strategy. Based in Houston, this individual will play a key role in shaping competitive and executable bids by partnering closely with Engineering, Supply Chain, Project Management, and Commercial teams.
- Develop accurate, well-structured cost estimates aligned with scope and execution strategy
- Maintain and continuously refine cost databases, benchmarks, and unit-rate build-ups
- Validate quantities, methods, and construction assumptions with cross-functional teams
- Produce clear estimating summaries and pricing models for tender submissions
- Support commercial strategy through scenario modeling and risk-adjusted pricing
- Prepare discipline-level and total project estimates covering materials, labor, equipment, subcontracting, logistics, and indirect costs
- Perform quantity take-offs from drawings, specifications, and technical documentation
- Build and maintain unit-rate libraries and historical cost benchmarks
- Coordinate with Supply Chain to obtain and validate subcontractor and supplier pricing
- Develop cost scenarios, sensitivities, and risk-adjusted estimate options to support bid strategy
- Prepare basis-of-estimate documentation, narratives, assumptions, inclusions, and exclusions
- Ensure full documentation and traceability of pricing models
- Support handover to execution teams by clearly communicating estimate assumptions and cost structures upon award
- 10–15 years of experience in estimating or cost development for large-scale construction or industrial projects
- Strong expertise in quantity take-offs and unit-rate development across civil, structural, mechanical, and electrical scopes
- Demonstrated ability to convert technical scope into clear, defensible cost estimates
- Experience supporting competitive tenders with multiple subcontractor and supplier interfaces
- Data Center or mission-critical facility estimating experience strongly preferred
Required:
- Bachelor’s degree in Engineering, Construction Management, or Quantity Surveying
OR - 15+ years of progressive estimating experience
- AACE (CEP or CCP), MRICS, or similar professional certification
- Experience with advanced estimating software and data analytics tools
- Houston-based office role
- Frequent coordination with Engineering, Supply Chain, and Commercial teams
- Heavy involvement in cost modeling, pricing reviews, and data analysis
- Occasional travel for supplier meetings, bid clarifications, or site visits
APPLY TODAY!
System One, and its subsidiaries including Joulé, ALTA IT Services, and Mountain Ltd., are leaders in delivering outsourced services and workforce solutions across North America. We help clients get work done more efficiently and economically, without compromising quality. System One not only serves as a valued partner for our clients, but we offer eligible employees health and welfare benefits coverage options including medical, dental, vision, spending accounts, life insurance, voluntary plans, as well as participation in a 401(k) plan.
System One is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy, childbirth, or related medical conditions), sexual orientation, gender identity, age, national origin, disability, family care or medical leave status, genetic information, veteran status, marital status, or any other characteristic protected by applicable federal, state, or local law.
#M-
#LI-
#DI-
Ref: #209-Rowland Houston
-
Intermediate Capital Cost Estimator (Mechanical)
Greentree, PA
Intermediate Capital Cost Estimator (Mechanical) Greentree, PA, United States Responsibilities Develop accurate cost estimates for mechanical equipment, piping, HVAC, and structural components for industrial manufacturing and Food & Beverage projects. ...
Date Posted: 03/16/2026 Recommended
-
Electrical Estimator
Kansas City, MO
Electrical Estimator Direct Hire | Onsite (5 days/week) Salary Range: $130,000 – $150,000 We are seeking an experienced Electrical Estimator to support the planning and execution of large-scale infrastructure projects. This role is responsible for deve...
Date Posted: 02/09/2026 Recommended
-
Lead Capital Cost Estimator (Multi-Trade)
Greentree, PA
Lead Senior Capital Cost Estimator (Multi-Trade) Greentree, PA Responsibilities Oversee and consolidate multi-discipline estimates for large-scale capital projects in Food & Beverage, advanced manufacturing, and heavy industrial sectors. Lead the devel...
Date Posted: 03/16/2026 Recommended
-
Business Line Commercial Manager-Data Center
Houston, Texas
Job Title: Business Line Commercial Manager-Data Center Location: Houston, Texas Type: Contract Compensation: $89 - $118 hr + (depending on experience) Contractor Work Model: Onsite Overview We are seeking a Commercial Manager to lead all commercial st...
Date Posted: 03/04/2026 Recommended
-
Construction Estimator (Drywall & Interior Finishes)
Boston, Massachusetts
Job Title: Construction Estimator (Drywall & Interior Finishes) Location: Boston, MA Job Type: Full-Time Position Overview: We are seeking an experienced Construction Estimator to support commercial interior construction projects, with a focus on drywa...
Date Posted: 03/30/2026 Recommended
-
Intermediate Capital Cost Estimator (Electrical & Instrumentation)
Greentree, PA
Intermediate Capital Cost Estimator (Electrical & Instrumentation) Greentree, PA, United States Responsibilities Perform detailed material take-offs from single-line diagrams, instrument indexes, cable schedules, and loop diagrams for power, control, a...
Date Posted: 03/16/2026 Recommended
-
Staff Engineering Technician - Substation
Houston, Texas
Staff Engineering Technician – Civil/Substation Design Location: Overland Park, KS – Houston, TX – Ann Arbor, MI Work Arrangement: Onsite, 5 days per week (local candidates only) Employment Type: Contract-to-Hire Schedule: Full-Time, 40 hours per week ...
Date Posted: 02/03/2026 Recommended
-
Chief Estimator
Pittsburgh, PA
Job Title: Chief Estimator Location: Pittsburgh, PA Type: Full-time Compensation: 110-140K Contractor Work Model: Onsite Hours: 40.0 Responsibilities Lead and manage the estimating team, including hiring, training, and performance development Oversee p...
Date Posted: 03/31/2026 Recommended
-
Lead Estimator - General Contractor
New York, NY
Lead Estimator - General Contractor Type: Direct Hire Industry: Residential reconstruction / upgrades (high-rises) Compensation: $120,000 - $145,000 annually Contractor Work Model: Onsite Hours: Monday - Friday, 8:00 AM - 5:00 PM Scope of Projects: up ...
Date Posted: 03/17/2026 Recommended
-
Controls Specialist - Data Center
Houston, Texas
Controls Specialist (Data Center) *** THIS POSITION IS BASED IN COLORADO CITY, TX 79512*** System One is seeking Controls Specialists in Colorado City, TX to be responsible for troubleshooting, diagnosing, and supporting PLC-based control systems withi...
Date Posted: 03/04/2026 Recommended
-
Controls Specialist - Data Center
Houston, Texas
Controls Specialist (Data Center) *** THIS POSITION WILL BE BASED IN CLAUDE, TX *** System One is seeking Controls Specialists in Claude, TX to be responsible for troubleshooting, diagnosing, and supporting PLC-based control systems within a mission-cr...
Date Posted: 03/04/2026 Recommended
-
Staff Engineering Technician - SDS (Substation Design Suite)
Houston, Texas
Job Title: Staff Engineering Technician – Substation Design (SDS) Job Type: Contract-to-Hire Work Model: 100% Onsite Position Overview We are seeking a Staff Engineering Technician with strong experience in Autodesk Inventor and Substation Design Suite...
Date Posted: 02/12/2026 Recommended
-
Civil 3D Drafter
Houston, Texas
Civil 3D Drafter Houston, TX Type: 6-month contract to hire Contractor Work Model: Onsite Summary We are seeking an Associate Engineering Technician to support engineering teams under general supervision. Duties would include technical tasks requiring ...
Date Posted: 02/26/2026 Recommended
-
I/O Technician
Houston, Texas
I/O Technician *** THIS POSITION IS BASED IN CLAUDE, TX 79019 *** System One is seeking I/O Technicians to be responsible for the installation, commissioning and testing of the control systems used in the data center. This includes monitoring and contr...
Date Posted: 03/04/2026 Recommended
-
Traffic Engineer PE
Houston, Texas
Job Title: Traffic Engineer (PE) Location: Houston, Texas Type: Direct Hire Contractor Work Model: Onsite System One is assisting a client in hiring a Traffic Engineer PE. The ideal candidate will demonstrate expertise and strong relationships with TXD...
Date Posted: 02/06/2026 Recommended
-
Sourcing Leader-Data Center
Houston, Texas
Job Title: Sourcing Leader-Data Center Location: Houston, Texas (77042) Type: Contract To Hire Compensation: $68.03 - $114.93 hourly Contractor Work Model: Onsite Overview The Sourcing Lead is accountable for the end-to-end management of sourcing activ...
Date Posted: 03/02/2026 Recommended
-
Sr . Structures (Bridge) Estimator
Kansas City, MO
Job Title: Sr. Structures (Bridge) Estimator Location: Kansas City, MO Sr . Structures (Bridge) Estimator Seeking a Senior Structures Estimator to join our dynamic team and contribute to our legacy of building the foundations for future generations. Jo...
Date Posted: 01/26/2026 Recommended
-
Process Project Engineer - Construction
Houston, TX
Job Title: Process Project Engineer – Construction Location: Houston, TX (Hybrid) Type: Contract (W2) | 40 hrs/week Pay: $80–$100/hr Ref: #209-Rowland Houston Overview Support a greenfield pharmaceutical facility build by leading process-focused scope ...
Date Posted: 04/01/2026 Recommended
-
Electrical Estimator
Lenexa, KS
Electrical Estimator A growing electrical contracting team is seeking an experienced Electrical Estimator to support ongoing commercial, industrial, and design-build projects. This role is based in Lenexa, KS, with a hybrid schedule (4 days onsite / 1 ...
Date Posted: 03/18/2026 Recommended
-
Project Cost Control Specialist
Tampa, Florida
Project Cost Control Specialist Tampa, FL System One is seeking a Project Cost Control Specialist in Tampa, FL to support large-scale capital projects on behalf of the project owner. This role is heavily focused on cost management and will play a criti...
Date Posted: 02/13/2026 Recommended
-
Staff Engineering Technician - Civil 3D Drafter
Houston, Texas
Staff Engineering Technician Houston, TX 77079 System One is seeking a Staff Engineering Technician in Houston, TX to perform advanced functions requiring technical knowledge and use of electronic applications, standards, and document control processes...
Date Posted: 01/29/2026 Recommended
-
Operations Administrator
Houston, Texas
Operations Administrator Location: Houston, TX 77002 (Downtown) Work model / schedule: Hybrid — Mon–Wed onsite, Thu–Fri remote Hours: Full-time, 40 hrs/week, 6:30 AM–3:30 PM Contract length: 1-year contract with potential to convert to full-time Overvi...
Date Posted: 03/18/2026 Recommended
-
Staff Engineering Technician - Substation
Ann Arbor, Michigan
Staff Engineering Technician – Civil/Substation Design Location: Overland Park, KS – Houston, TX – Ann Arbor, MI Work Arrangement: Onsite, 5 days per week (local candidates only) Employment Type: Contract-to-Hire Schedule: Full-Time, 40 hours per week ...
Date Posted: 02/03/2026 Recommended
-
Project Engineer
Pittsburgh, PA
Project Engineer, Building Division - Position Description The ideal candidate will be responsible for assisting in the management of projects consistent with the company mission and values to meet or exceed budget goals while enhancing the company's r...
Date Posted: 03/12/2026 Recommended
-
Remote Proposal Manager
Houston , Texas
Proposal Manager Remote (Preference: East or Central time zones) On-call / as-needed workload 30 hours a week depending on demand and workload - hours can fluctuate $48.51–$61.75/hr Overview System One is hiring a Proposal Manager to support business d...
Date Posted: 03/27/2026 Recommended
-
Supplier Manufacturing Engineer - Kansas City MO
Cheswick, PA
System One is seeking a Supplier Manufacturing Engineer to support critical supplier performance and manufacturing execution. This role is highly hands-on and focused on improving supplier processes, resolving manufacturing challenges, and driving on-t...
Date Posted: 03/26/2026 Recommended
-
Supplier Manufacturing Engineer - Chicago IL
Cheswick, PA
System One is seeking a Supplier Manufacturing Engineer to support critical supplier performance and manufacturing execution. This role is highly hands-on and focused on improving supplier processes, resolving manufacturing challenges, and driving on-t...
Date Posted: 03/26/2026 Recommended
-
Clean Utilities Project Manager
Houston, TX
CLEAN UTILITIES PROJECT MANAGER (PHARMA/GMP) Location: Houston, TX (Hybrid) Type: Contract (40 hrs/week) Overview We are seeking an experienced Clean Utilities Project Manager to lead the design, installation, commissioning, and qualification support o...
Date Posted: 04/02/2026 Recommended
-
Assoc Engineering Technician (Water) - Civil 3D Designer Drafter
Orlando, Florida
Associate Engineering Technician – Civil (Water) Location: Orlando, Florida Work Schedule: Onsite – 5 days per week Employment Type: Contract-to-Hire Industry: Water & Infrastructure Position Overview Our client is seeking a Civil Associate Engineering...
Date Posted: 03/12/2026 Recommended
-
Manufacturing Planning Manager
Houston, Texas
Job Title: Manufacturing Planning Manager Location: Houston, Texas Type: Contract Compensation: $54 - $92/hr + (depending on experience) Contractor Work Model: Onsite Overview We are seeking a Manufacturing Planning Manager to lead planning and schedul...
Date Posted: 03/04/2026 Recommended