Technical Manager-Data Center

Houston, Texas

Apply Apply with LinkedIn
Save

Type: Contract

Experience: 0

Category: Construction

Contractor Work Model: Onsite

Brand: System One

Compensation Range: 70.00 - 110.00 Per Hour

Job ID: 347231

Date Posted: 03/04/2026

Shortcut: http://jobs.systemone.com/zoThTg


Job Title: Technical Manager-Data Center
Location: Houston, Texas

Type: Contract
Compensation: $70 - $110/hr+ (depending on experience)
Contractor Work Model: Onsite

Overview
We are seeking a Technical Manager to lead technical oversight across a portfolio of active Data Center projects. This individual will serve as the single point of accountability for all technical matters, ensuring seamless coordination between engineering, procurement, and construction teams.
This role does not perform design work. Instead, it focuses on execution—ensuring client-provided designs are properly interpreted, aligned across contractors, and implemented efficiently in the field. The Technical Manager plays a critical role in resolving interface issues, maintaining consistency across projects, and proactively mitigating execution risks.

Key Responsibilities
  • Serve as the primary technical point of contact across the full Data Center project portfolio
  • Provide centralized technical leadership to Program and Project Managers
  • Oversee technical interfaces between client designs, engineering contractors, PEMB suppliers, and construction teams
  • Manage and coordinate RFIs, clarifications, and technical deviations in alignment with contractual requirements
  • Guide site engineering and field teams in resolving technical conflicts and constructability challenges
  • Oversee BIM and model coordination to ensure alignment, constructability, and sequencing (without performing model authoring)
  • Ensure consistent interpretation of design documentation across multiple projects and contractors
  • Identify and drive modularization and standardization opportunities to improve constructability and repeatability
  • Provide visibility to leadership on technical risks that could impact schedule, cost, or execution
Required Experience
  • 18–25 years of experience in technical leadership, construction engineering coordination, or execution-focused technical management
  • Extensive experience on large-scale Data Center projects
  • Strong background executing client-issued designs rather than producing engineering deliverables
  • Proven ability to coordinate multiple engineering firms, vendors, and construction contractors
  • Demonstrated success resolving complex technical interface issues in fast-paced, multi-project environments
Qualifications
Mandatory:
  • Bachelor’s degree in Engineering or Construction Management
    OR
  • 25+ years of relevant execution-focused technical leadership experience
Preferred:
  • Experience with modular construction or standardized building systems
  • Background with PEMB structures and vendor-engineered packages
  • Portfolio- or program-level oversight across multiple concurrent projects
Work Environment
Houston-based role with regular travel to active project sites. This position requires close collaboration with Program Management, clients, site leadership, engineering contractors, and suppliers. Periodic field presence is necessary to support issue resolution, interface alignment, and technical reviews.

APPLY TODAY!


System One, and its subsidiaries including Joulé, ALTA IT Services, and Mountain Ltd., are leaders in delivering outsourced services and workforce solutions across North America. We help clients get work done more efficiently and economically, without compromising quality. System One not only serves as a valued partner for our clients, but we offer eligible employees health and welfare benefits coverage options including medical, dental, vision, spending accounts, life insurance, voluntary plans, as well as participation in a 401(k) plan.

System One is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy, childbirth, or related medical conditions), sexual orientation, gender identity, age, national origin, disability, family care or medical leave status, genetic information, veteran status, marital status, or any other characteristic protected by applicable federal, state, or local law.

#M-
#LI-
#DI-

Ref: #209-Rowland Houston

  • Traffic Engineer PE

    Houston, Texas

    Job Title: Traffic Engineer (PE) Location: Houston, Texas Type: Direct Hire Contractor Work Model: Onsite System One is assisting a client in hiring a Traffic Engineer PE. The ideal candidate will demonstrate expertise and strong relationships with TXD...

    Date Posted: 02/06/2026 Recommended

  • Engineer Staff, Sr - Power (Houston)

    Houston, Texas

    Job Title: Engineer Staff, Sr - Power Location: Houston, Texas Overview System One is seeking a Senior Staff Power Engineer and play a key role in shaping the future of electrical reliability and safety across major natural gas and petrochemical operat...

    Date Posted: 03/03/2026 Recommended

  • Structural Designer or Drafter

    Cannonsburg, PA

    Job Title Civil / Structural Designer / Drafter (Junior, Mid-Level, Senior, Lead) Position Overview We are seeking Civil / Structural Designers and Drafters at multiple experience levels to join our growing engineering team. These roles support a wide ...

    Date Posted: 03/18/2026 Recommended

  • Staff Engineering Technician - Substation

    Houston, Texas

    Staff Engineering Technician – Civil/Substation Design Location: Overland Park, KS – Houston, TX – Ann Arbor, MI Work Arrangement: Onsite, 5 days per week (local candidates only) Employment Type: Contract-to-Hire Schedule: Full-Time, 40 hours per week ...

    Date Posted: 02/03/2026 Recommended

  • Senior Electrical Engineer

    Downers Grove, IL

    Job Title: Senior Electrical Engineer Location: Downers Grove, IL Type: Contract (Contract to Direct Possible) Duration: 6 months Compensation: $67.40 - $82 (Flexibility DOE) Contractor Work Model: Onsite Hours: 40 hours/week (Monday - Thursday 7:30am ...

    Date Posted: 02/24/2026 Recommended

  • Project Engineer - Industrial/Structural

    Richland, Washington

    Job Title: Project Engineer - Industrial/Structural Location: Richland, Washington Type: Contract To Hire Compensation: $55.00 - 75.00 hourly Contractor Work Model: Onsite Hours: Mon-Fri 8am-5pm Project Engineer - Industrial/Structural In a world of po...

    Date Posted: 03/26/2026 Recommended

  • Project Engineer - Industrial/Mechanical

    Richland, Washington

    Job Title: Project Engineer - Industrial/Mechanical Location: Richland, Washington Type: Contract To Hire Compensation: $55.00-75.00 / hourly Contractor Work Model: Onsite Hours: Mon-Fri. 8am-5pm Project Engineer - Industrial/Mechanical In a world of p...

    Date Posted: 03/26/2026 Recommended

  • Staff Engineering Technician - SDS (Substation Design Suite)

    Houston, Texas

    Job Title: Staff Engineering Technician – Substation Design (SDS) Job Type: Contract-to-Hire Work Model: 100% Onsite Position Overview We are seeking a Staff Engineering Technician with strong experience in Autodesk Inventor and Substation Design Suite...

    Date Posted: 02/12/2026 Recommended

  • Electrical Project Manager

    Austin, TX

    Job Title: Electrical Project Manager Location: Austin, Texas Type: Direct Hire System One is assisting a client in hiring a Electrical Project Manager to support a large-scale mission critical project in the Austin, Texas region. This role is on-site ...

    Date Posted: 01/02/2026 Recommended

  • Electrical Project Manager

    Lockhart, TX

    Job Title: Electrical Project Manager Location: Lockhart, Texas Type: Direct Hire System One is assisting a client in hiring an Electrical Project Manager to support a large-scale mission critical project in the Lockhart, Texas. This role is on-site an...

    Date Posted: 01/02/2026 Recommended

  • Contracts Manager-Data Center

    Houston, Texas

    Job Title: Contracts Manager-Data Center Location: Houston, Texas Type: Contract To Hire Compensation: $61.04 - $115.46 hourly Contractor Work Model: Onsite Overview The Project Contract Manager is responsible for leading all contractual and commercial...

    Date Posted: 03/02/2026 Recommended

  • Staff Engineering Technician - Civil 3D Drafter

    Houston, Texas

    Staff Engineering Technician Houston, TX 77079 System One is seeking a Staff Engineering Technician in Houston, TX to perform advanced functions requiring technical knowledge and use of electronic applications, standards, and document control processes...

    Date Posted: 01/29/2026 Recommended

  • I/O Technician

    Houston, Texas

    I/O Technician *** THIS POSITION IS BASED IN CLAUDE, TX 79019 *** System One is seeking I/O Technicians to be responsible for the installation, commissioning and testing of the control systems used in the data center. This includes monitoring and contr...

    Date Posted: 03/04/2026 Recommended

  • Manufacturing Planning Manager

    Houston, Texas

    Job Title: Manufacturing Planning Manager Location: Houston, Texas Type: Contract Compensation: $54 - $92/hr + (depending on experience) Contractor Work Model: Onsite Overview We are seeking a Manufacturing Planning Manager to lead planning and schedul...

    Date Posted: 03/04/2026 Recommended

  • Project Manager

    Canonsburg, Pennsylvania

    Job Title: Project Manager Location: Canonsburg, PA Type: Direct Hire Compensation: $130000 annually Contractor Work Model: Hybrid Transportation Project Manager Civil Engineering | Transportation Infrastructure Objective This position is responsible f...

    Date Posted: 03/10/2026 Recommended

  • EPC Project Commercial Manager

    San Antonio, TX

    Job Title: EPC Project Commercial Manager Location: San Antonio, TX Type: Direct Compensation: $130,000 +/- (Depending on experience) Contractor Work Model: Onsite Hours: 5 – 8 hours day System One is e are seeking a high-caliber EPC Project Commercial...

    Date Posted: 03/18/2026 Recommended

  • Civil 3D Drafter

    Houston, Texas

    Civil 3D Drafter Houston, TX Type: 6-month contract to hire Contractor Work Model: Onsite Summary We are seeking an Associate Engineering Technician to support engineering teams under general supervision. Duties would include technical tasks requiring ...

    Date Posted: 02/26/2026 Recommended

  • Facilities Project Manager / Cost Engineer

    Irvine, CA

    Facilities Project Manager / Cost Engineer Irvine, CA 92614 System One is seeking a mid-level Project Manager with a strong construction management background to support a portfolio of facilities projects while also serving as a cost engineering / cost...

    Date Posted: 02/24/2026 Recommended

  • Mechanical Engineer / Designer

    Foley, AL

    Mechanical Engineer / Designer Location: Foley, AL 36535 Job Type: Contract-to-Hire Work Model: Onsite Hours: 40 hours/week Overview System One is seeking a Mechanical Engineer / Designer to support industrial projects from concept through installation...

    Date Posted: 03/25/2026 Recommended

  • Senior Engineer

    Austin, Texas

    Position Description Play a key role in supporting Austin-based growth initiatives. You’ll work on a wide range of pipeline and infrastructure projects that bring natural gas utility service to new subdivisions and commercial developments. We’re lookin...

    Date Posted: 03/20/2026 Recommended

  • Network Engineer

    Houston, Texas

    Job Title: Network Engineer Location: Houston, TX Type: Contract Work Model: Onsite Responsibilities Develop, plan, and implement projects and initiatives related to network access and design, acting as a senior technical resource for network technolog...

    Date Posted: 02/23/2026 Recommended

  • Substation Design Engineer

    Houston, Texas

    Job Title: Substation Design Engineer Location: Houston, Texas Type: Direct Hire Compensation: Contractor Work Model: Hybrid/Remote Substation Electrical Engineer – Grid Mid to Senior Level | Electrical Power Engineering Hybrid Work Schedule Full-Time ...

    Date Posted: 03/06/2026 Recommended

  • Senior Project Engineer

    Cambridge, Massachusetts

    Job Title: Senior Project Engineer Location: Cambridge, Massachusetts Type: Direct Hire Compensation: $160000 - $210000 annually Contractor Work Model: Hybrid System One is currently seeking a Senior Project Engineer on a direct hire position located i...

    Date Posted: 02/03/2026 Recommended

  • Remote Proposal Manager

    Houston , Texas

    Proposal Manager Remote (Preference: East or Central time zones) On-call / as-needed workload 30 hours a week depending on demand and workload - hours can fluctuate $48.51–$61.75/hr Overview System One is hiring a Proposal Manager to support business d...

    Date Posted: 03/27/2026 Recommended

  • Nuclear Engineer V, I&C

    Perry , Ohio

    System One is seeking experienced Nuclear I&C Engineers (Engineer V level) to support major nuclear power plant upgrades and modernization efforts across multiple sites. This role requires deep expertise in instrumentation & control systems, including ...

    Date Posted: 03/17/2026 Recommended

  • Electrical - Project Engineer

    Raleigh, North Carolina

    Electrical Project Engineer ? Raleigh, NC | Full-Time | Hybrid Work Schedule Available Are you a skilled Electrical Engineer looking for an opportunity to lead complex building system projects and make a lasting impact? Join a collaborative, employee-o...

    Date Posted: 02/09/2026 Recommended

  • Project Cost Control Specialist

    Tampa, Florida

    Project Cost Control Specialist Tampa, FL System One is seeking a Project Cost Control Specialist in Tampa, FL to support large-scale capital projects on behalf of the project owner. This role is heavily focused on cost management and will play a criti...

    Date Posted: 02/13/2026 Recommended

  • Industrial Electrical Designer

    Foley, AL

    Industrial Electrical Designer Foley, AL 36535 System One is seeking an Industrial Electrical Designer in Foley, Alabama to support heavy-industrial and manufacturing projects. This position works closely with Electrical, Mechanical, Structural, and Ci...

    Date Posted: 03/25/2026 Recommended

  • Wastewater Project Manager

    Boise, Idaho

    Job Title: Wastewater Project Manager Location: Boise, Idaho Type: Contract Compensation: $85 - $90 hourly Contractor Work Model: Onsite PROJECT MANAGER Provides direction and management for projects and ensures on-schedule completion within or below b...

    Date Posted: 03/03/2026 Recommended

  • Project Controls-Data Center

    Houston, Texas

    Job Title: Project Controls-Data Center Location: Houston, Texas Type: Contract To Hire Compensation: $63.71 - $117.07 hourly Contractor Work Model: Onsite Overview The Project Controls Manager leads all planning, cost control, risk management, and per...

    Date Posted: 03/02/2026 Recommended