Construction Scheduling Manager

Westerville, Ohio

Apply Apply with LinkedIn
Save

Type: Direct-Hire

Experience: 5

Category: Construction

Contractor Work Model: Onsite

Brand: System One

Job ID: 317740

Date Posted: 09/23/2025

Shortcut: http://jobs.systemone.com/y8ROqn


Our client is looking to hire a Construction Scheduling Manager to work within their Central Engineering department, responsible for the development, implementation, maintenance, and training of scheduling best practices throughout the company. This position will support construction operations throughout the Midwest and Mid-Atlantic regions, working closely with project managers, engineers, and estimators from project procurement through initiation and final delivery of the projects.
 
Essential Duties and Responsibilities:

  • Organize and manage Oracle Primavera Cloud database structure.
  • Assist estimating and project staff with the development of Pre-Bid and Baseline Schedules.
  • Develop best practices while interfacing with the project team, project managers, subcontractors, and design engineers to monitor and update project schedules and resources.
  • Develop and administer schedule training for Project Engineering and Estimating staff.
  • Review project schedules for accuracy and logic and analyze critical path updates, schedule progress vs what is occurring in the field, and evaluate schedule options.
  • Assist the Project Teams in maintaining, updating, and monitoring the CPM schedules.
  • Audit project schedule(s) and alert the project team to potential problem areas.
  • Perform Time Impact Analysis (TIA) and assist in the development of change orders and claims.
  • Generate forecasts, variance reports, and other documentation used to monitor and manage projects.

Education and Experience
  • A Bachelor’s Degree in Engineering, Construction Management, or Business Administration preferred or experience in lieu of degree.
  • Ideal candidates will possess 5+ years of experience in construction Project Scheduling, preferably in heavy highway, heavy civil, or mass concrete construction projects.
  • Proficiency in Oracle Primavera Scheduling Software, preferably in Oracle Primavera Cloud.
  • Excellent written and verbal communication skills.
  • Prior experience developing project schedules and performing critical path, earned value, and schedule impact analysis.
  • Ability to work in concert with estimators and project teams.

BENEFITS:
Company offers a competitive compensation and benefits package including profit sharing, medical, life, and disability insurance, paid time off, and a generous 401K plan.



Ref: #404-IT Pittsburgh

  • Construction Scheduling Manager

    Annapolis Junction, Maryland

    Our client is looking to hire a Construction Scheduling Manager to work within their Central Engineering department, responsible for the development, implementation, maintenance, and training of scheduling best practices throughout the company. This po...

    Date Posted: 09/23/2025 Recommended

  • Construction Scheduling Manager

    Elyria, Ohio

    Our client is looking to hire a Construction Scheduling Manager to work within their Central Engineering department, responsible for the development, implementation, maintenance, and training of scheduling best practices throughout the company. This po...

    Date Posted: 09/23/2025 Recommended

  • Construction Scheduling Manager

    Richmond, Virginia

    Our client is looking to hire a Construction Scheduling Manager to work within their Central Engineering department, responsible for the development, implementation, maintenance, and training of scheduling best practices throughout the company. This po...

    Date Posted: 09/23/2025 Recommended

  • Construction Scheduling Manager

    Carnegie, Pennsylvania

    Our client is looking to hire a Construction Scheduling Manager to work within their Central Engineering department, responsible for the development, implementation, maintenance, and training of scheduling best practices throughout the company. This po...

    Date Posted: 09/23/2025 Recommended

  • Lead Electrical Engineer - Electrical & Instrumentation

    Spring Grove, Pennsylvania

    Summary This position is responsible for supporting the business in Electrical and Instrumentation Engineering for the facility. The primary roles of this position are to manage and implement plant capital and major repair projects, provide day to day ...

    Date Posted: 10/29/2025 Recommended

  • Maritime Project Engineer

    North Kingstown, Rhode Island

    Summary Statement A Marine Project Engineer is responsible for overseeing and managing engineering projects related to marine structures, vessels, and offshore installations. The Marine Project Engineer must understand Classification Society rules and ...

    Date Posted: 12/05/2025 Recommended

  • Substation Civil/Structural Engineer

    Spring Valley, New York

    Substation Civil/Structural Engineer On-site role near Spring Valley, NY Salary Range: $89,000 – $106,000 About the Role We’re looking for a Substation Civil/Structural Engineer to play a key role in the design and development of critical electrical in...

    Date Posted: 11/12/2025 Recommended

  • Lead Electrical Engineer

    Pittsburgh, PA

    Lead Electrical Engineer Pittsburgh, PA System One is seeking a Lead Electrical Engineer to provide technical support and oversight for electrical projects in the Pittsburgh, PA Region. The position requires demonstrated engineering and design competen...

    Date Posted: 09/18/2025 Recommended

  • Structural - Project Engineer

    Alexandria, Virginia

    Structural Project Engineer Alexandria, VA | Full-Time | Hybrid Work Schedule Available Are you a creative and detail-oriented engineer who enjoys solving complex design challenges? We’re looking for a Structural Project Engineer to join a dynamic, emp...

    Date Posted: 11/05/2025 Recommended

  • Construction Estimator

    McMurray, PA

    Senior Estimator Location: McMurray, PA Employment Type: Direct Hire Salary Range: $100,000 – $150,000 Position Overview System One is seeking a Senior Estimator to lead and deliver comprehensive estimating services for a wide range of construction pro...

    Date Posted: 11/04/2025 Recommended

  • Overhead Transmission Engineer III

    Syracuse, New York

    Job Title: Overhead Transmission Engineer Location: Syracuse, NY About the Role We are seeking a motivated Overhead Transmission Engineer to support the design and development of overhead transmission systems for power delivery projects. This role offe...

    Date Posted: 11/12/2025 Recommended

  • Senior Electrical Engineer

    McMurray, PA

    Job Title: Senior Electrical Engineer Reports To: Chief Engineer Position Summary: The Senior Electrical Engineer will lead a team of engineers and designers in the development and execution of electrical power distribution systems for industrial manuf...

    Date Posted: 11/14/2025 Recommended

  • Senior Maritime Electrical Manager

    North Kingstown, Rhode Island

    Summary Statement The Senior Maritime Electrical Manager leads the electrical engineering team in the design, integration, and delivery of shipboard electrical systems. This role is responsible for overseeing all aspects of electrical design, ensuring ...

    Date Posted: 12/05/2025 Recommended

  • Superintendent 5 Electrical

    Raleigh, North Carolina

    Electrical Superintendent – Conventional Power Location: Project location TBD (requires mobilization to site) Initial Phase: 6 months of project planning based in Kansas City, KS Per Diem: $132.12/day (non-taxed) while in Kansas City; $173/day (taxed) ...

    Date Posted: 09/11/2025 Recommended

  • Senior Maritime Engineering Director

    North Kingstown, Rhode Island

    Job Title: Senior Maritime Engineering Director Location: North Kingstown, Rhode Island Type: Direct Hire Compensation: Contractor Work Model: Onsite Hours: Add the job’s scheduled days and times (delete if not needed) Security Clearance: List security...

    Date Posted: 12/05/2025 Recommended

  • Superintendent 5 Electrical

    New York, New York

    Electrical Superintendent – Conventional Power Location: Project location TBD (requires mobilization to site) Initial Phase: 6 months of project planning based in Kansas City, KS Per Diem: $132.12/day (non-taxed) while in Kansas City; $173/day (taxed) ...

    Date Posted: 09/11/2025 Recommended

  • Superintendent 5 Electrical

    Atlanta, Georgia

    Electrical Superintendent – Conventional Power Location: Project location TBD (requires mobilization to site) Initial Phase: 6 months of project planning based in Kansas City, KS Per Diem: $132.12/day (non-taxed) while in Kansas City; $173/day (taxed) ...

    Date Posted: 09/11/2025 Recommended

  • Superintendent 5 Electrical

    Denver, Colorado

    Electrical Superintendent – Conventional Power Location: Project location TBD (requires mobilization to site) Initial Phase: 6 months of project planning based in Kansas City, KS Per Diem: $132.12/day (non-taxed) while in Kansas City; $173/day (taxed) ...

    Date Posted: 09/11/2025 Recommended

  • Superintendent 5 Electrical

    St. Louis, Missouri

    Electrical Superintendent – Conventional Power Location: Project location TBD (requires mobilization to site) Initial Phase: 6 months of project planning based in Kansas City Per Diem: $132.12/day (non-taxed) while in Kansas City; $173/day (taxed) at p...

    Date Posted: 09/11/2025 Recommended

  • Superintendent 5 Electrical

    Houston, Texas

    Electrical Superintendent – Conventional Power Location: Project location TBD (requires mobilization to site) Initial Phase: 6 months of project planning based in Kansas City Per Diem: $132.12/day (non-taxed) while in Kansas City; $173/day (taxed) at p...

    Date Posted: 09/11/2025 Recommended

  • Construction Project Manager

    Catoosa, Oklahoma

    System One is working with a local client to find a Construction Project Manager in Tulsa Ok. Salary range - $95-$115k Job Description Responsible for managing and coordinating assigned construction projects from initiation through execution to success...

    Date Posted: 11/12/2025 Recommended

  • Electrical - Project Engineer

    Raleigh, North Carolina

    Electrical Project Engineer ? Raleigh, NC | Full-Time | Hybrid Work Schedule Available Are you a skilled Electrical Engineer looking for an opportunity to lead complex building system projects and make a lasting impact? Join a collaborative, employee-o...

    Date Posted: 11/05/2025 Recommended

  • Senior Project Engineer - Roadway

    Cranberry Township , Pennsylvania

    Job Title: Senior Roadway Project Manager – Licensed PE Location: Pittsburgh, PA Job Type: Full-Time Job Description: We are seeking a highly experienced Roadway Project Manager with 20+ years of proven success in transportation and highway engineering...

    Date Posted: 09/19/2025 Recommended

  • Structural Engineer

    Guaynabo, Puerto Rico

    System One is seeking a Structural Engineer in Guaynabo Puerto Rico for a direct hire! Summary: Lead and contribute to the structural design and analysis of bridges and other transportation related structures, ensuring compliance with industry standard...

    Date Posted: 10/22/2025 Recommended

  • Senior Structural Bridge Engineer

    Columbia, South Carolina

    Senior Structural Bridge Engineer Location: Columbia, SC Company: System One Employment Type: Full-Time | Engineering System One is seeking a Senior Structural Bridge Engineer to join a high-performing transportation design team in Columbia, SC. This i...

    Date Posted: 12/05/2025 Recommended

  • Field Civil Engineer II

    Roxboro, NC

    Field Civil Engineer II – Roxboro, NC Location: Roxboro, NC Type: 6-Month Contract-to-Direct (Potential for Permanent Hire) Pay Range: $38.46 – $46.01/hour (Depending on Experience) Per Diem: $105/day Schedule: Aligned with Project Needs Start Date: AS...

    Date Posted: 11/12/2025 Recommended

  • Sales Engineer

    Chattanooga, TN

    Sales Engineer – Nuclear Manufacturing Location: Chattanooga, TN | Experience Preferred: 10+ Years System One is looking for an experienced Sales Engineer for a direct hire opportunity for our client in Chattanooga, TN. In this role, you will serve as ...

    Date Posted: 11/24/2025 Recommended

  • Architect - Project

    Richmond, Virginia

    Project Architect Richmond, VA | Full-Time | Hybrid Work Schedule Available Are you an experienced architect looking for an opportunity to lead exciting, complex projects while mentoring the next generation of designers? We’re seeking a Project Archite...

    Date Posted: 11/05/2025 Recommended

  • Civil Engineer - Senior

    Atlanta, Georgia

    Senior Civil Engineer Atlanta, GA Full-Time | Competitive Salary | Hybrid Flexibility | Direct Hire Opportunity A leading employee-owned engineering and design firm is seeking an experienced Senior Civil Engineer to lead complex land development and in...

    Date Posted: 11/12/2025 Recommended

  • Plant Engineer

    Maidsville, WV

    Position: Plant Engineer Location: Maidsville, WV Employment Type: Direct Hire Status: Accepting Candidates Compensation: $95,000 – $115,000 annually, plus 20% target bonus Position Overview A leading power generation facility is seeking a skilled Plan...

    Date Posted: 10/09/2025 Recommended